6.
Unlock the rotor latches, and open the rotor covers on the pumps, as shown in Figure 7-1.
Note:
The rotor cover on the EC inlet pump cannot remain open because of hindrance from the incubator wall.
Figure 7-1: Rotor covers open
7.
Open the five external mounting clips.
8.
Confirm that the internal mounting clips are in the correct horizontal position, as shown in
Figure 7-2, and if they are not, perform the following steps:
a.
Grasp the top internal mounting clip, bend it to the side, and pull and rotate it one
‑
quarter
turn clockwise to open the clip.
b.
Grasp the bottom internal mounting clip, bend it to the side, and pull and rotate it one
‑
quarter
turn clockwise to open the clip.
Figure 7-2: An internal mounting clip in the correct horizontal position
Load Cell Expansion Set
Quantum
®
Cell Expansion System • Operator's Manual for Software Version 2.1
7-3
Summary of Contents for Quantum Cell Expansion System
Page 1: ...Quantum Cell Expansion System SOFTWARE VERSION 2 1 Operator s Manual...
Page 9: ...vi Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 10: ...1 Preface Quantum Cell Expansion System Operator s Manual for Software Version 2 1 1 1...
Page 19: ...Preface 1 10 Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 20: ...2 Introduction Quantum Cell Expansion System Operator s Manual for Software Version 2 1 2 1...
Page 38: ...3 Touch Screen Quantum Cell Expansion System Operator s Manual for Software Version 2 1 3 1...
Page 60: ...4 Troubleshooting Quantum Cell Expansion System Operator s Manual for Software Version 2 1 4 1...
Page 120: ...9 Washout Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 9 1...
Page 166: ...13 Custom Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 13 1...
Page 172: ...15 Reports Quantum Cell Expansion System Operator s Manual for Software Version 2 1 15 1...