Electrical connection for all brine and groundwater heat pumps of the type TERRA

Page 13

1 2 3 4 5 6 7

12 13 14

21 22 23

28 29 30

Main

electricity

con-

nection

230

V

/50

Hz

N Pe

N Pe

brine

resp.

deep

well

pump

230V

Control

c

urrent

con

-

nection

230V/50Hz

N Pe

L

L

L

Pe

water

pressure

switch

(accessory)

Subsequent the necessary connections that are per-
formed as inline connections are shown. The gray
connections have to be connected on site, whereby
the rest is pre connected already.

The wire diameter for the main electricity and for the
brine resp. the deep well pump wire has to be dimen-
sioned corresponding to the technical data. (See pa-
ge 3 and 4 for brine resp. groundwater systems)

24 25 26

Pe

External

activation

EW

contact

31

A

C

B

P<

Connecter description:

Main electricity connecter 230V 50Hz

:

1. Compressor 230V, pre connected

Connection

connection 230V/50H

(if no control is integrated): a po-

tential free contact has to be connected between con-
necter 24 and 25

a potential free contact has to be connec-

ted between connecter 25 and 26 (remove the pre in-
stalled bridge)

Connectern 1 to 3:

Connecter 4 to 7:

Connecter 8 to 11:

Connecter 21 to 23:

Connecter 24 and 25:

Connecter 25 and 27:

brine resp. deep well pump

Control current

z

External activation

EW barrier:

2. Compressor 230V, pre connected

Connecter 12 to 14:

27

Connecter 28 to 31:

Water pressure switch, at groundwater systems to
be installed on site, whereby the pre installed bridge
has to be removed; at brine systems the contact 28
and 30 has to be bridged.

1.

Compressor

230V

,

pre

installed

8 9 10 11

2.

Compressor

230V

,

pre

installed

Summary of Contents for S-TWIN

Page 1: ...iture July 2008 TERRA SW TWIN_230V_installation_jul08 engl cdr Expenditure July 2008 TERRA SW TWIN_230V_installation_jul08 engl cdr h e a t p u m p T V VIN T E R R A S W T W I N 2 3 0 V fo r b r i n e o r g r o u n d w at e r p l a n t s Ty p e B a s i c ...

Page 2: ...ating side 12 2 11 Electrical scheme 12 2 12 Electrical connection 13 3 1 General information 15 4 1 Description 16 4 2 Rang ofApplication 16 4 3 Delivery Content 16 4 4 Technical Data 17 4 5 Installation schematic 17 5 1 Description 6 1 Description 19 6 2 Range ofApplication 19 6 3 Accessories 19 18 5 2 Rang ofApplication 18 5 3 Delivery Content 18 5 4 Technical Data 18 Changes in technology and ...

Page 3: ...rter and should be provided with a well clo sing door closing The heat pump isn t setup for the increased need of heat for drying subfloor or carcass This must be done by equipment specially designed for this task Tip for security Transport Sound emission Drying of subfloor or carcass Service and maintenance Aregular maintenance as well as a check and Care of all important plant parts guarantees a...

Page 4: ... gas inlet cooled scroll cachet compressors stainless steel heat exchanger as condenser stainless steel heat exchanger as vaporizer coolant collector and dryer Thermostatic expansion valve coolant observing window coolant heat exchanger High and low pressure manometer console with all operational and safety equipment Thermorelais to protect the compressor Internal motor protection Robust frame hea...

Page 5: ... R 407 C R 407 C Coolant quantity 2x2 0 kg 2x2 1 kg 2x2 6 kg Compressor oil quantity 2x1 1 lt 2x1 1 lt 2x1 85 lt Amount of collector circuits 7 9 10 Total pipe length 700 900 1000 Brine quantity mixture 245 lt 315 lt 350 lt Recommended resp integrated buffer loading pump Recommended pump power Heating output at B 5 C W 35 C in kW 17 86 21 02 26 70 Heating output at B 5 C W 45 C in kW 17 12 20 34 2...

Page 6: ... l h Minimal groundwater quantity 3 700 l h 4 500 l h 5 500 l h Pressure loss on heating circuit 15 kPa 17 kPa 19 kPa Pressure loss on collector circuit 16 kPa 18 kPa 18 kPa Heating flow and return R 1 1 4 A G 1 1 4 A G 1 1 2 A G Brine inlet and outlet R 1 1 4 A G 1 1 4 A G 1 1 2 A G Used coolant R 407 C R 407 C R 407 C Coolant quantity 2x2 0 kg 2x2 1 kg 2x2 6 kg Compressor oil quantity 2x1 1 lt 2...

Page 7: ...ter There are several safety applications integrated to protect the heat pump A combined high and low pressure manome ter which can be reset by switching the machi ne off and back on Max flow temperature limit with will automati cally reset A Thermorelais which can be reset by swit ching the machine off and back on Internal winding protection With groundwater heat pumps minimum tem perature limit ...

Page 8: ...nnection with grind voltage 3 return connection 4 Brine resp groundwater inlets 5 Brine resp groundwater outlets 6 Opening Ø 50mm for electrical output R 1 1 2 use enclosed connection pipe 1 1 4 R 1 1 2 use enclosed connection pipe 1 1 4 R 1 1 2 use enclosed connection pipe 1 1 4 For brine heat pumps see page 3 For groundwater heat pumps see page 4 Dimensions for connections or 1 1 2 or 1 1 2 or 1...

Page 9: ...0cm is required in front of and next to the heat pump See illustration on by The appropriated laws regulations and Norms have to be taken into notice specially the EN 378 Part 1 To avoid noise conduction via the piping the enclo sed flexible connection pipes for the flow and return as well as for the brine in and outlet resp the groundwater in and outlet have to be used For a leveled installation ...

Page 10: ...Buffer Hygienik T T T V1 P2 B2 T A6 B9 B3 B1 layer separate plate T T heatpump Buffer Hygienik T B2 T M1 V1 A B System scheme 2 TERRA heat pump with IDM Hygienik with dividing membrane The upper part of the buffer is loaded under priority by a priority valve The lower part of the buffer is the heating buffer The heating circuit can be a pumped or mixed cir cuit whereby it is recommended to fit a m...

Page 11: ...er and is loaded under priority by the priority val ve The heating is supplied by an extra buffer The heating circuit can be a pumped or mixed cir cuit whereby it is recommended to fit a mixing val ve System scheme 3 TERRA heat pump with IDM Hygienik and extra heating buffer The sensor B2 has to be placed inside the buffer The sensor B2 has to be placed inside the buffer C M1 V1 P2 P1 A B ...

Page 12: ...l as a drain on the lowest point To avoid heat losses the connection pipes have to be insulated with an appropriate material Oxygen diffusion If not diffusion proof plastic pipes for the under floor heating or a vented heating system is used it can happen that if steel pipes steel radiators or steel buf fer are installed corrosion occurs onto these steel parts Corrosion particles can settle down i...

Page 13: ...e free operation of the heat pump it can be asked at your local electricity supp lier Thermorelais suitable motor protection needs to be installed room sensor grid voltage Main electricity connection 230 V 50 Hz control current connection 230 V 50 Hz activation of the brine or groundwater pump 230 V 50 Hz Page 11 The starting current limitation equipment can be in serted The starting currents can ...

Page 14: ...y The amount of electrical applications is steadily ri sing and with them the potential for faults Together with power lines transmitting devices and other tele communication installations a invisible electro smog is created These disturbances affect all systems both biologi cal us humans and electronic systems They cause undesired faulty currents in many ways We can just guess the consequences on...

Page 15: ... Pe External activation EW contact 31 A C B P Connecter description Main electricity connecter 230V 50Hz 1 Compressor 230V pre connected Connection connection 230V 50H if no control is integrated a po tential free contact has to be connected between con necter 24 and 25 a potential free contact has to be connec ted between connecter 25 and 26 remove the pre in stalled bridge Connectern 1 to 3 Conn...

Page 16: ...llowing criteria decides which the suitable Heat source system is Is enough ground or surface water available Is the ground or surface water temperature also during the winter above 8 C Is the ground or surface water quality sufficient enough Is enough space for a horizontal collector availa ble Is a bore hole as a result of the available space re quired The different heat source systems are descr...

Page 17: ...ti freeze If too much anti freeze is added the specific heat capacity of the brine decreases 4 2 Range ofApplication Suitable for all heat pumps of typeTERRAS 4 Brine Horizontal Collector 4 3 Delivery Content Plastic pipes Ø 25 x 2 3mm in loops of 100m each the amount of loops depends on the heat pump out put Connection set including Manifold with gate valves for each circuit Safety blow off Manom...

Page 18: ...re the area has to be increased for poor grounds gravel The circuits have to be bedded in fine sand 0 3 0 5mm Contact your IDM partner for further consultation Pipes from the manifold towards the cellar An example for a TERRA 8 S HGL heat pump with 4 circuits and a manifold connection inside the cel lar For a length of 2m where the pipes are brought together they have to be insulated The connectio...

Page 19: ...rculation pump Manifold has to ordered separately Connection set manifold 5 4 Technical data Type TS 5 TS 7 TS 8 TS 10 TS 12 Amount of bore holes 1 1 2 2 2 Total depth collector m 80 100 130 150 190 Length of manifold L 60 60 120 120 120 Collector Ø mm 40 40 40 40 40 40 Connection pipe Ø DN 40 DN 40 DN 40 DN 40 DN 40 circulation pump 25 60 26 60 25 60 25 80 25 80 Brine mixture 160 200 250 290 360 ...

Page 20: ... the he at pump The well cover has to be light and airtight to avoid formation of algae and a silting of the well The well pump should be a deep well pump The well should be flushed for at least 48 hours af ter constructing to avoid a contamination of the system 6 Ground and Surface water systems 6 2 Range ofApplication 6 3Accessories Water inlet temperature Min water flow Groundwater quality min ...

Page 21: ...55 C has to be checked and if needed the shut off tem perature has to be changed The heat pump has a start up delay so that the compressor will just start after this time To drain the heat pump on the heating side frost protected the heat pump return connection has to be opened The groundwater return temperature limit has to be set before start up so that the heat pump shuts down at a water return...

Page 22: ...per operation of the controls the manual has to be looked up An annual service and maintenance of the installati on by a customer service is recommended in con cern of warranty claims Display Humming alarm light main switch heating control accessory operating and fault lights flow temperature brine flush switch fuse ...

Page 23: ...e intact For the position of the fuse look up the Description of the heat pump Is the fuse of the primary control intact e g the EVA system See referring system description Open the yellow lid and check the individual fault lights for this see 9 3 right and illustration on page 12 9 3 Is one of the 5 red fault lights shining High pressure fault or Low pressure fault Motor protection Over temperatu...

Page 24: ...mfangreiche Seminarangebot für Fachleute bei der IDM ENERGIEFAMILIE steht für Sie jederzeit auf unserer Website zur Verfügung Wir freuen uns über Ihre Anmeldung www idm energie com Your IDM Partner IDM ENERGIESYSTEME GMBH Seblas 16 18 9971 Matrei in Osttirol Telefon 43 0 4875 6172 0 Telefax 43 0 4875 6172 85 E mail team idm energie at The IDM ZENTRALE IN MATREI IN OSTTIROL www idm energie com Semi...

Reviews: