2.11 Electrical scheme
The electrical connection has to be reported with
your local electricity supply.
The required size of the upstream fuse for the main
electric circuit can be seen within the technical data
on page 3 and 4. It is important to use a sluggish fuse
(characteristic D). The relevant wire diameter has to
be calculated by an electrician.
A
to protect the compressor is already
integrated.
A
for the brine or ground-
water pump
and adjusted.
The heat pump is usually operated with a weather
compensating flow temperature control.
The connections to control the heat pump with a
are prepared inside the console. (Look
up the electrical connections on page 12)
The
has to be inside certain tolerance
margins to insure a trouble free operation of the heat
pump (it can be asked at your local electricity supp-
lier)
Thermorelais
suitable motor protection
needs to be installed
room sensor
grid voltage
Main electricity connection
230 V/50 Hz
control current connection
230 V/50 Hz
activation of the brine or
groundwater pump
230 V/50 Hz
Page 11
The starting current limitation equipment can be in-
serted.The starting currents can be reduced around
approx. 50% (after pressure balance).
For TERRA 5 S till 30 S
Art. Nr.: 351 211
motor protection
activation of the buf-
fer loading pump
1x230V/ 50 Hz
Legend:
F 1
S 1
B 1
fuse 6,3 A t
control switch On/Off
line filter
23
21 22
1
Platine IO2, idm.multitalent.wp
S1
Line
Load
B1
Grid
control
currency
2
3
0V/5
0H
z
23
L
N
Pe
F1
operator device Mecmatic - MM,
back side
output connection
input connection
Master Bus A
Slave Bus
RS 485
Master Bus B
RS 485
Systembus A
Systembus B
Buskable 8-polig
EEPROM IO2
EEPROM MM
Fuse 0,5 A t
18