REVISED DATE: 5/5/2016
KENNEL CLUB PLAYGROUND INSTALLATION GUIDELINE
Page 8
Kennel Club Playground
Installation Guideline
With the deck platforms in place proceed to fasten the Dog House Crawl panels to the 4x4
posts as shown below. The panels are placed behind the 4x4 posts so that the outside edges of
the panels are flush with the outside edges of the 4x4 posts (A). The tops of the panels rest
directly up against the underside of the deck platform frame (B).
Kennel Club Assembly (Contd.)
B
A