Operator's Manual
First Edition • First Printing
16
T70 • T90 • T120
Part No. 134207
Inspections
Do Not Operate Unless:
You learn and practice the principles of safe
generator operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
Know and understand the pre-operation
inspection before going on to the next
section.
3 Follow setup instructions.
4 Follow operating, transport and towing
instructions.
5 Only use the generator as it was intended.
Pre-operation Inspection
Fundamentals
It is the responsibility of the operator to perform a
pre-operation inspection and routine maintenance.
The pre-operation inspection is a visual inspection
performed by the operator prior to each work shift.
The inspection is designed to discover if anything
is apparently wrong with the generator set before
putting it in service.
The pre-operation inspection also serves to
determine if routine maintenance procedures are
required. Only routine maintenance items specified
in this manual may be performed by the operator.
Refer to the list on the next page and check each
of the items.
If damage or any unauthorized variation from
factory delivered condition is discovered, the
generator set must be tagged and removed from
service.
Repairs to the generator set may only be made by
a qualified service technician, according to the
manufacturer's specifications. After repairs are
completed, the operator must perform a
pre-operation inspection again before putting the
generator into service.
Scheduled maintenance inspections shall be
performed by qualified service technicians,
according to the manufacturer's specifications.
Summary of Contents for T120C