![Terex RL4 LED Operator'S Manual Download Page 43](http://html1.mh-extra.com/html/terex/rl4-led/rl4-led_operators-manual_1088871043.webp)
First Edition • First Printing
Operator's Manual
Transport and Lifting Instructions
Part No. 1286390GT
RL4LED™ Vertical Mast
41
Observe and Obey:
Only qualified riggers should rig the machine.
Only certified crane operators should lift the
machine and only in accordance with the
applicable crane regulations.
Be sure the crane capacity, loading surfaces
and straps or lines are sufficient to withstand
the machine weight. See the serial label for the
machine weight.
Lifting the Machine with a Crane
or Forklift
Fully lower the mast to the stowed position.
Rotate the light bar perpendicular to the tongue of
the machine and tighten the T-handle, into the
notch, to secure and align the arrows.
Fully retract, raise and lock all outrigger jacks and
outriggers.
Close and secure the cabinet doors.
Inspect the entire machine for loose or unsecured
items.
Use the lifting eye to lift the machine using a crane.
Use the designated forklift pockets to lift the
machine using a forklift.
Summary of Contents for RL4 LED
Page 49: ......