Operator's Manual
Second Edition • First Printing
Transport and Lifting Instructions
46 QS
™
-R12 • QS
™
-R15 • QS
™
-R20
Part No. 1297730GT
Brake Release Operation
1
Chock the wheels to
prevent the machine from
rolling.
2
Be sure the winch line is properly secured to
the drive chassis tie points and the path is
clear of all obstructions.
3
Push in the black brake
release knob to open the
brake valve.
4
Pump the red brake release pump knob.
After the machine is loaded:
1
Chock the wheels to prevent the machine from
rolling.
2
Pull out the red Emergency Stop button at both
the ground and platform controls to the on
position, and turn the key switch to the
platform position.
3
Press the drive function button.
4
Press and hold the function enable switch on
the control handle. Move the control handle off
center and immediately release it to reset the
brakes.
5
Push the red Emergency stop button at both
the ground and platform controls to the off
position.
Towing the QS-12R, the QS-15R, and the QS-20R
is not recommended. If the machine must be
towed, do not exceed 2 mph / 3.2 km/h.
Summary of Contents for Genie QS-12R
Page 57: ......