
Operator's Manual
Second Edition • Second Printing
Inspections
34
GS
™
-2669DC • GS
™
-3369DC • GS
™
-4069DC
Part No. 1305659GT
Test Stowed Drive Speed
53 Press and hold the lift function enable button,
and press the platform down button.
Result: The platform should lower.
54 Press and hold the drive/steer function enable
switch on the control handle. Slowly move the
control handle to full drive position in the
direction indicated by the blue arrow.
Result: The maximum achievable drive speed
with the platform stowed should not exceed
6.6 ft / 2 m per second.
If the drive speed with the platform stowed
exceeds 6.6 ft / 2 m per second, immediately tag
and remove the machine from service.
55 Press and hold the drive/steer function enable
switch on the control handle. Slowly move the
control handle to full drive position in the
direction indicated by the yellow arrow.
Result: The maximum achievable drive speed
with the platform stowed should not exceed
4.4 ft / 1.34 m per second.
If the drive speed in reverse with the platform
stowed exceeds 4.4 ft / 1.34 m per second,
immediately tag and remove the machine from
service.
Test the Outrigger System (if equipped)
56 Press the outrigger function button.
On the LCD screen, a circle below
the outrigger function symbol will
turn on.
If the control handle is not moved within seven
seconds of pushing the outrigger function button,
the circle below the outrigger function symbol will
turn off and outrigger function will not operate.
Press the outrigger function button again.
57 Press and hold the function enable switch on
the control handle.
58 Move the control handle in the direction
indicated by the yellow arrow.
Result: The outriggers should extend. The
individual outrigger indicator lights will flash
green as the corresponding outrigger extends.
59 Continue holding the control handle in the
direction indicated by the yellow arrow until all
outrigger indicator lights turn solid green and a
long beep is heard from the platform controls
alarm. The machine is now level. At this point,
the drive and steer functions are disabled.
Note: If the control handle is released too soon
during extension, the outrigger indicator lights will
continue to flash green, indicating the outriggers
are not contacting the ground.
Note: If the control handle is released too soon
after the outriggers have contacted the ground, a
long beep will not be heard at the platform controls
and the outrigger indicator lights will be solid
green. If a long beep is not heard and the outrigger
indicator lights are solid green, this condition may
indicate the outriggers are not fully deployed or the
machine is not level.
Summary of Contents for Genie GS-2669DC
Page 60: ......