Service and Repair Manual
May 2021
Platform Overload Components
80
GS
™
-2669 DC • GS
™
-3369 DC • GS
™
-4069 DC
Part No. 1306585GT
5 Activate and hold the calibration toggle switch
in the up position for 4 seconds to enter full
load calibration mode.
Result: The LCD screen first displays
DOWN
CHK
, then
GO UP: ?
.
6 Start the engine from the ground controls and
fully raise the platform.
7 When the platform has reached full height,
momentarily activate the calibration toggle
switch in the up position to confirm.
Result: The LCD screen first displays
UP
CHK
, then
GO DWN: ?
.
8 Fully lower the platform to the stowed
position.
9 When the platform is fully stowed,
momentarily activate the calibration toggle
switch in the up position to confirm.
10 Fully raise the platform from the ground
controls.
Note: The platform will raise and automatically
stop at predetermined points to gather data.
Continue holding the Function Enable and
Platform Up buttons until the platform has reached
full height.
11 When the platform has reached full height,
momentarily activate the calibration toggle
switch in the up position to confirm.
12 Fully lower the platform to the stowed
position.
Note: The platform will lower and automatically
stop at predetermined points to gather data.
Continue holding the Function Enable and
Platform Down buttons until the platform is fully
stowed.
13 When the platform is fully stowed,
momentarily activate the calibration toggle
switch in the up position to confirm.
Result: The LCD screen displays
Success
.
Calibration is complete.
14 Push in the ground controls red Emergency
Stop button to the off position.
Confirm Calibration:
1 Add additional weight to the platform.
Model
Additional weight
GS-2669
300 lbs
136 kg
GS-3369
200 lbs
91 kg
GS-4069
160 lbs
73 kg
2 Pull out the red Emergency Stop button to the
on position and start the engine.
3 Raise the platform.
Result: At a predetermined height the engine
shuts off, an audible alarm sound and
platform up function does not operate.
4 Cycle the red Emergency Stop button off,
then back on.
5 Use the emergency down function to lower
the platform to the stowed position.
6 Remove the weight or rated load from the
platform.
Summary of Contents for Genie GS-2669 DC
Page 138: ...Service and Repair Manual May 2021 126 Ground Control Box Layout ...
Page 140: ...Service and Repair Manual May 2021 128 Platform Control Box Layout ...
Page 141: ...May 2021 Service and Repair Manual 129 Electrical Schematics Electrical Schematic ...
Page 144: ...Service and Repair Manual May 2021 132 Electrical Schematic ...
Page 145: ...May 2021 Service and Repair Manual 133 Hydraulic Schematics Hydraulic Schematic ...
Page 147: ......