Operator's Manual
Fifth Edition · First Printing
Part No. 133556
GS-2668 DC • GS-3268 DC
23
Pre-operation Inspection
R
Be sure that the operator’s, safety and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
R
Be sure that all decals are legible and in place.
See Decals section.
R
Check for hydraulic oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
R
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
R
Electrical components, wiring and electrical
cables
R
Hydraulic power unit, tank, hoses, fittings,
cylinders and manifolds
R
Battery pack and connections
R
Drive motors
R
Wear pads
R
Tires and wheels
R
Limit switches, alarms and horn
R
Platform overload components
R
Nuts, bolts and other fasteners
R
Platform entry gate
R
Beacon and alarms (if equipped)
R
Brake release components
R
Safety arm
R
Platform extension
R
Scissor pins and retaining fasteners
R
Platform control joystick
R
Inverter (if equipped)
Check entire machine for:
R
Cracks in welds or structural components
R
Dents or damage to machine
R
Excessive rust, corrosion or oxidation
R
Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened
R
Side rails are installed and snap pins and bolts
are fastened
Inspections
Summary of Contents for Genie GS-2668DC
Page 1: ......