7.

  With the help of an associate, raise the remaining EUR  

 

upright set (from starter unit) and the ZTP upright set 

 

 

and connect with left to right channel beams Be 

 

 

sure the channel beams are fully seated.

9a.

 Attach the wall tie to the top of the unit on the left,  

 

right and middle posts at the back of the unit. Taller  

 

units require additional wall ties (included), for support.

 

NOTE: Wall Ties are REQUIRED to be used   

 

for unit stability on Single Entry Units.

9b.

 Assemble your second unit by following the same steps 

 

listed. Attach the cross aisle ties to the top and bottom  

 

of the left, right and middle posts.

For Single Entry Units

For Double Entry Units

8.

  Continue to build your shelf levels by placing left to  

 

right channel beams at the desired locations.