3-65537
92GR MM188 (11---87)
RECOMMENDED FIRST 50---HOUR MACHINE INSPECTION
After the first 50 hours of operation, the following
procedures are recommended:
1. Check the brush pattern for correct brush
adjustment.
2. Change the hydraulic fluid filter.
3. Check the torque of the engine cylinder head
cap screws.
4. Perform all 50---hour interval lubrication and
maintenance procedures listed in the
Maintenance chart.
5. Check the valve tappet clearance after the first
250 hours of operation.
Summary of Contents for 92 GR
Page 1: ...Operator Manual...
Page 10: ...SECTION 1 SPECIFICATIONS CONTENTS Page Machine Specifications 1 1 Machine Dimensions 1 3...
Page 14: ...92GR MM188 6 87 1 4...
Page 33: ...92GR MM188 10 87 2 18...
Page 44: ...3 65545 92GR MM188 11 87 04307 HYDRAULIC SCHEMATIC...
Page 56: ...3 65557 92GR MM188 11 87 04309 ELECTRICAL SCHEMATIC...
Page 57: ...92GR MM188 11 87 3 65558 01502 ELECTRICAL SCHEMATIC ACCESSORIES...