9
Measurement Procedures and
Preparation
Battery loading: Remove the battery cover on the back and put
a 9V battery inside.
Battery replacement: When the symbol of “
” appears on the
LCD display, the battery should be replaced with a new one.
The battery symbol will be displayed on the LCD, this is
a
battery low indicator.
9.1 POWER button
:
Press
button to power on. Again
Press
button to power off.
9.2 Data hold button:
Press the “
” button to go into hold mode, and “HOLD”
appears on the screen to allow you to read the data.
Press “
”this button once again to deactivate it.
EN-20
Summary of Contents for TM-195
Page 1: ...User s Manual TM 195 RF three Axle Field Strength Meter ...
Page 2: ...HB2TM1950000 ...
Page 3: ......
Page 15: ...6 Identifying Parts EN 9 ...
Page 23: ...mW cm2 11 V m per axis Overload limit 0 to50 C 0 2dB EN 17 ...
Page 32: ...EN 26 ...
Page 44: ...15 SAFETY INFORMATION DANGER EN 38 ...
Page 48: ...EN 42 ...
Page 49: ...EN 1 ...
Page 50: ...EN 2 ...