3
RUNNING MANUAL
TenarisHydril
IDM Code GDL37413/0 / Mar
ch 2020
CONNECTION SPECIFIC RUNNING GUIDELINES
T
enarisHydril EasyDock™ Connection
.
Manufacturing Facility
.
Manufacturing Quarter
.
Traceability Numbers.
3.
The pipe grade will be stenciled in the pipe ID no
less than 6” back from the pipe end.
4.
Make note of the connector and pipe grade, there
should be a disparity.
5.
Shift ARK(s) to unlocked position and tighten bolt.
6.
Check if ARK(s) are moving freely, if not loosen with
the aid of anti-seize spray (WD40).
7.
Ensure the connections are cleaned and free of
all debris and / or contaminants, cleaning methods
employed should conform to the recommendations
contained within the TenarisHydril running manual.
8.
Visually inspect threads and shoulders as per
GDL31457 “Recommended guidelines for the field
inspection of TenarisHydril connections”, prior to
running ensuring no damage is evident.
9.
Check the condition and fit of the O-ring
(elastomeric seal).
10.
Pipe should arrive with the O-ring installed, if not
check fit of O-rings onboard.
11.
Ensure there are spare O-rings on board.
12.
Clean, dry then replace protectors.
13.
Re set all ARK(s) and secure in order to prevent
them from damage when pipe is moved.
14.
Never move or handle pipe without protectors
securely in place.