Page: 11
TEMPTEK, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-6352 Fax: 317-881-1277
Email: [email protected]
PTK Series Polyethylene Pump Tank Station with Checkmate Control System
conductor cable rated for the motor’s power requirements and install according to local
codes. Some motor starters may require a separate 110 volt line be installed.
E.
GENERAL
1.
Make certain all ground connections to the unit are properly affixed.
2.
Make certain power conductor, disconnecting means, and fusing are properly
sized according to the unit’s power supply requirements.
3.
Make certain all electrical connections are tightly affixed. Any loose wiring
connections must be tighten before engaging the power supply.
4.
Make certain no moisture or standing water is present inside the electrical
cabinet.
2.10 PROBE INSTALLATION
A.
For systems with the Checkmate control panel, two probes are shipped inside the
electrical cabinet and must be installed into the return distribution piping. These probes
are encased in a threaded bulb well.
B.
P2 - From Process Probe: Install this probe into the from process return piping.
C.
P4 - Tower/Evaporator Out Probe: Install this probe into the return line from the tower or
evaporator piping.