Figure 25: Field wiring to MB
Display panel
Depending on the options selected, the unit display
panel may have either three VFD cutouts (25 ton to
50 ton) or seven VFD cutouts (25 ton to 80 ton). The
cutouts either have a blank plate or a VFD display
installed that coincides with the unit’s options.
Figure 26: Three VFD cutout display panel
Figure 27: Seven VFD cutout display panel
Note:
Depending on the VFD options selected
for the unit, some of the cutouts may have a
blank plate instead of a VFD display.
Display panel adjustment
The display panel can be adjusted up or down.
To adjust panels with 3 VFD cutouts, remove the 2
brackets with 8 screws total. Adjust the panel to the
desired, allowable height (see Figure 30 and Figure
28). Assemble the panel in the desired location by
re-installing the 2 brackets and 8 screws using the
pre-drilled holes (see Figure 30).
To adjust panels with 7 VFD cutouts, remove the 3
brackets with 12 screws total. Adjust the panel to the
desired, allowable height (see Table 50 and Figure
29). Assemble the panel in the desired location by
re-installing the 3 brackets and 12 screws using the
pre-drilled holes (see Figure 31).
For VFD field parameter settings, refer to
Tempmaster