Unpacking the 8820 MSR
Uncrate and Inspect
Unpacking and Site Preparation
2-5
PN 76.8820IM30-A
Tellabs 8820 Multi-service Switch Router System Installation
Accessory Box Inspection
Open the accessory box to ensure that you have received all items shown in
.
Inspect the Physical Line Modules (Optional)
Each physical line module (PLM) package contains a single card encased in foam pads and
wrapped in an anti-static bag.
Remove each package from the shipping carton and place it on a non-static surface where
it can be inspected prior to installation.
Step 1
Cut the metal strapping from around the shipping carton.
Step 2
Open the PLM carton and inspect for damage.
Table 2-1
8820 MSR
Accessory Box Contents
Item
Description
Part Number
Mounting hardware
❑
10-32 and 12-24 mounting screws for
8860 Multi-service Switch Router rack
mount
Not orderable as
separate item.
Cable
❑
6-ft Ethernet
❑
6-ft Null Modem
❑
98-0727-000
❑
98-0766-000
DC Power Kit
(DC model only)
❑
Unterminated power cable—loose
connector, pins and in-line splice
components.
❑
20-0879-000
Adaptors
❑
Two 9-pin adaptors for console cable
❑
9-pin computer adaptor
❑
25-pin modem adaptor
Not orderable as
separate items.
Wrist strap
❑
Anti-static (ESD) wrist-band grounding
strap with 170 plug termination
(standard banana plug)
❑
96-0837-000
N
OTE
Currently the 8820 MSR chassis is shipped loaded with the Physical Line
Modules (PLMs). Proceed to the section
if you are
not inspecting newly purchased PLMs.