MAINS PRESSURE HOT WATER STORAGE SYSTEM
COMMISSIONING CHECKLIST
The Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to
install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
Customer
Name
Telephone
Number
Address
Cylinder Make and Model
Cylinder Serial Number
Commissioned by
(print name)
Registered Operative ID Number
Company
Name
Telephone
Number
Company Address
Commissioning
Date
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulations Notification Number
(if applicable)
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only)
Is the primary circuit a sealed or open vented system?
Sealed Open
What is the maximum primary flow temperature?
0
C
ALL SYSTEMS
What is the incoming static cold water pressure at the inlet to the system?
bar
Has a strainer been cleaned of installation debris (if fitted)?
Yes
No
Is the installation in a hard water area (above 200ppm)?
Yes
No
If yes, has a water scale reducer been fitted?
Yes
No
What type of scale reducer has been fitted?
What is the hot water thermostat set temperature?
0
C
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)?
l min
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
Yes
Type of control system (if applicable)
Y Plan
S Plan
Other
Is the cylinder solar (or other renewable) compatible?
Yes
No
What is the hot water temperature at the nearest outlet?
0
C
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
Yes
16