background image

TSC Tristor Combi Direct

3bar 22mm Cold mains  inlet 

Domestic hot outlet 

Water indented Fill line 

Manual Fill  

3Kw Immersion Heater 

Drain Cock Fitted

Over fill Float Switch 

Over Fill 

F&E 

73C 

73C 

3Kw Immersion Heater 

10

Shock Arrestor

Summary of Contents for Tristor MF Series

Page 1: ...Tristor MF Installation Guide ...

Page 2: ...chmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out the installation commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme Visit www centralheati...

Page 3: ...eventh Annual Service Eighth Annual Service Ninth Annual Service Tenth Annual Service THE INSTALLER MUST SIGN THE BENCHMARK CHECKLISTS AND FILL IN THE APPROPRIATE INSTALLATION INFORMATION COMPLETING THE COMMISSIONING AND USER INSTRUCTIONS IS A REQUIREMENT OF ADL1 OF THE BUILDING REGULATIONS FAILURE TO DO SO MAY INVALIDATE THE WARRANTY ON THIS PRODUCT All Electrical Installation Must be to IEE Stan...

Page 4: ...arranty of this cylinder commences on the date of manufacture this date can be found on the data badge applied to the cylinder The Benchmark section of this booklet page 18 must be filled in on commissioning of the first install The service record must then be completed every 12 months afterwards Telford Copper Stainless Cylinders LTD hold no responsibility for Errors or Omissions caused by the In...

Page 5: ... open and supply water to Tristor ready for manual fill to F E tank Do not power immersion heater at this point 9 Remove 7 round copper F E tank lid Number 5 then add inhibitor 1 litre Not Supplied open service valve number 4 and slowly start filling F E tank to water indent fill line number 6 close service valve once filled to line Do not over fill F E tank past the half way fill indent line this...

Page 6: ...at Input Coil Standing Heat Loss single coil 150 Litre 2 5m 3kw 1 8m 20kw 1 75kwh 24hrs 200 Litre 2 5m 3kw 1 8m 20kw 2 01kwh 24hrs 280 Litre 2 5m 3kw 1 8m 20kw 2 21kwh 24hrs Domestic hot flow rate 18lpm at 73ºC store temperature Max Domestic hot out 47C to 48C max 2 5mtr distance to hot tap Max Domestic working pressure 3bar max working pressure Shock Arrestor Set to 3bar Immersion Heater 240v 50h...

Page 7: ...ter from cold 150 litre 110min 200 litre 130min 280 litre 185min Store Heat up Time with one immersion heater 150 litre 220min 200 litre 260min 280 litre 370min Direct Heat up Time with Immersion Heater 7 Weights 150 litre 50kg 200 litre 60kg 280 litre 75kg Dimensions 150 litre 1400 x 510 200 litre 1750 x 510 280 litre 2000 x 554 ...

Page 8: ...mperature at hot outlets does not reach more than 47 C to 50 C 4 Check shock arrestor holds air pressure at 3Bar with mains water isolated and hot tap open re fill with air if low in pressure 5 Check Immersion Heater stats are set to 73 C 6 Check 3Bar pressure reducing valve is installed Not supplied 7 Check braided 1 2 filling loop hose is disconnected from F E tank and 1 2 service valve Fit blan...

Page 9: ...ect Over Fill 1 2 3 F E 4 5 6 7 73C Over fill float switch Water indented fill line Shock arrestor Domestic hot outlet 3bar 22mm cold mains inlet Boiler coil flow Boiler coil return Drain cock fitted 3kw Immersion Manual fill 9 ...

Page 10: ...ct 3bar 22mm Cold mains inlet Domestic hot outlet Water indented Fill line Manual Fill 3Kw Immersion Heater Drain Cock Fitted Over fill Float Switch Over Fill 1 2 3 F E 4 5 6 7 73C 73C 3Kw Immersion Heater 10 Shock Arrestor ...

Page 11: ...Over Fill 1 2 3 F E 4 5 6 7 73C 3amp None return Valve 3Bar Pressure Reducing Valve 3Kw Parts Circled Are Not Supplied 73C Tristor Direct Layout 11 ...

Page 12: ...rminal 4 Live to boost immersion heater 3kw cable sizing 2 5 three core heat resistant cable 20amp fuse spur Double Pole for each immersion heater Link Terminal 4 5 when only using one immersion heater Terminals E7 Programmer wiring Programmer Not Supplied With Standard Tristor 20amp DP 13amp fuse 3 Neutral out to immersion heater s Programmer is only fitted on request when purchasing 12 ...

Page 13: ...ree core heat resistant cable max length 1 5 metre 20amp fuse spur for each immersion heater TSD Stat Cotherm PCBfor over fill box Test Meter Element Test only Warning Test with power off 1 Turn off power and remove fuse at fude spar 2 Remove wires from stat 3 Set test metre to ohms 4 Contact black test probe to neutral point 5 Contact red test probe to live point 6 Reading on test meter should be...

Page 14: ...r switch is switched on Check domestic two port valve is open when Float Switch float is in down position Raise the float to close valve White lifter on the side of the valve should move back and forward when opening and closing valve with float Check water level in F E Tank has not activated float switch if over filled then drain to F E Tank level indent line Check blend valve is not blocked at p...

Page 15: ... water should stop running through hot outlets and red led should flash aggressively 3 Check Temperature at hot outlets does not exceed 47c to 51 C 4 Check Shock arrester holds pressure at 3Bar with mains water isolated and hot tap open refill with air if low in pressure 5 Check Immersion Heater stats are set to 73 C 6 Check 3Bar pressure reducing valve is installed Not Supplied 7 Check braided 1 ...

Page 16: ...e ALL SYSTEMS PRIMARY SETTINGS indirect heating only Is the primary circuit a sealed or open vented system Sealed Open What is the maximum primary flow temperature 0 C ALL SYSTEMS What is the incoming static cold water pressure at the inlet to the system bar Has a strainer been cleaned of installation debris if fitted Yes No Is the installation in a hard water area above 200ppm Yes No If yes has a...

Page 17: ...er directly or through a Competent Persons Scheme A Building Regulations Compliance Certificate will then be issued to the customer Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation The...

Page 18: ...ments Signature SERVICE 5 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 7 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 9 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 2 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Sign...

Page 19: ...19 NOTES ...

Page 20: ...NOV 2004 Tel 01952 257963 Fax 01952 253452 Furrows Business Park Haybridge Road Wellington Telford Shropshire TF1 2FE www telford group com ...

Reviews: