Installation 3
Installation 3
Installation 3
Installation 3
Installation 3
3-1
TELEDYNE ANALYTICAL INSTRUMENTS
Installation
Installation of the analyzer includes:
1. Unpacking the system.
2. Recognizing the necessary precautions when installing the system.
3. Hooking up the sample/span gas and air supply to appropriate connections.
4. Installing the Micro-Fuel Cell sensor(s).
5. Hooking up electrical connections.
6. Testing the system.
3.1
Unpacking the Analyzer
The analyzer is shipped with all the materials and special items you need to install
and prepare the system for operation. Carefully unpack the analyzer and inspect it for
damage. Immediately report any damage to the shipping agent. Remove the packing
slip and verify that you have received all the components listed in Table 3-1.
Table 3-1. Accessory Kit for Model 3160
Qty
Qty
Qty
Qty
Qty
Part No.
Part No.
Part No.
Part No.
Part No.
Description
Description
Description
Description
Description
3
G285
Weld glands, VCR-type
3
G284
Gaskets, VCR-type
3
N284
Nuts, female (Hoke 4NM316)
2
W64
Wrench, Open End, 3/4"–5/8"
1
M52973
Instruction Manual
3.2
Front Panel
The Model 3160 front and rear panels are illustrated in Figure 3–1 on the follow-
ing page. The front panel contains the following displays and controls:
1. Main power switch.
2. Light Emitting Diode (LED) display: the O
2
concentration is displayed in
bold lettering.