![Teledyne 3000MB Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/teledyne/3000mb/3000mb_operating-instructions-manual_1080396021.webp)
Percent Oxygen Analyzer
Installation 3
3-1
Teledyne Analytical Instruments
Installation
Installation of the Model 3000PB Analyzer includes:
1. Unpacking
2. Mounting
3. Gas connections
4. Electrical connections
5. Installing the Micro-Fuel Cell
6. Testing the system.
3.1
Unpacking the Analyzer
The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the analyzer and inspect
it for damage. Immediately report any damage to the shipping agent.
3.2
Mounting the Analyzer
The Model 3000PB is designed for bulkhead mounting in nonhazard-
ous environments. There are four mounting lugs—one in each corner of the
enclosure. The outline drawing, at the back of this manual, gives the mount-
ing hole size and spacing. The drawing also contains the overall dimensions.
Do not forget to allow an extra 1
3
/
8
" for the hinges.
Be sure to allow enough space in front of the enclosure to swing the
outer door open—a 11
3
/
4
" radius, as shown in Figure 3-2.
All electrical connections are made via cables which enter the NEMA-4
housing through ports in its side. No conduit fittings are supplied. The
installer must provide two 3/4" NPT and two 1" NPT adapters and the
appropriate sealing conduit.
For gas connections, the unit is supplied with 1/4" tube fittings, and 6
millimeter adapters are supplied for metric system installations.