STEP 2: Place LED Light as shown on top of Tower. Mark (with pencil) for final location.
STEP 1: Feed power cable through top of Tower
LED Power Cable
Align
Mark
EQ.
EQ.
TOP VIEW
Section:
Description:
Page No:
Date:
SID_101
2 of 12
Sep 2012
CABLE THROUGH TOWER
REMOVE SAFETY STOPPER
sidewise