See the applicable manual.
Once the hob position has been dimensioned,
the seal must be affixed (J) to the hob.
Fix the clamps (K) into the holes on the lower
p a r t of the case, as shown in drawing 9, by
tightening the four screws supplied (ø4.2
mm).
The clamps (K) and seal (J) are supplied in the
packaging along with the hob.
The gas connection of the hob must be made
in accordance with the applicable installation
standards or regulations.
The room must be provided with adequate
ventilation, in accordance with the applicable
regulations.
The hob is pre p a red with a 1/2” diameter
s c rew connection according to ISO 228-1. A
ø10/12 mm copper pipe to which the gas
supply pipe can be welded is supplied as an
accessor y.
Each time the gas connection nut is re m o v e d
the washer must be replaced.
To avoid causing damage to the hob during
installation when tightening the gas pipe
connection nut, a maximum grip torque of 350
cm kgf must be used.
Once the gas connection has been made,
the air tightness of the installation must be
checked. If the check is made using air, the
testing pressure must be no greater than 200
g/cm2. If air is not available, use soapy water
to check that no leak is produced at the
connections. It is strictly recommended not to
use a flame to make the check.
Once the hob has been installed, check that
the flame is regulated at its minimum setting.
To make this check light the burners and make
s u re that they do not go out when you change
rapidly from high to low.
Do not connect the hobs with urban gas
containing CO.
8
Positioning of the oven
Anchoring of the hob
Gas connection
K
K
K
fig. 9