TECSYSTEM TRBH Instruction Manual Download Page 16

16 

    

TRBH

 

SYSTEM

 

 

 

 
 
 

 
 

 
 
 

 

 

 
 
 
 
 

 

 
 

  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

Connect the motor connector A, of the single fan, with the relative motor power 
cable to the MOTORS POWER LINE output of the control box.  
 
B1 bar motor power supply 
 
 
 

 

B2 bar motor power supply 

  
 

 

BOX B1 

BOX B2 

The electrical connections of the two bars B1 and B2 depend on the configuration of the TRBH system selected 
(programmed on the thermometric control unit).  

 

1) In the 

B2-M3

 configuration, 2 bars (B1-B2) 6 fans connected (M1-M2-M3-M4-M5-M6), the positioning and connection 

of the fans must absolutely respect what is shown in the image below:   
 
 

ATTENTION:

 incorrect positioning or 

connection of the fans could result in 
anomalies in operation of the TRBH 
system.  

Connect the B motor connector of the single fan, with the relative digital cable motor signals to the MOTORS CONTROL 
LINE output of the control box.  

 

B1 bar digital connection:  
        
 
  

  
 

 

 
B2 bar digital connection:  

 

M1 

M2 

M3 

1 White  
2 Brown 
3 Blue  
4 Black 

5 White 
6 Brown 
7 Blue 
8 Black 

9 White 
10 Brown 
11 Blue 
12 Black 

 

M1 

M2 

M3 

~ Brown 
~ Blue 

~ Brown 
~ Blue 

~ Brown 
~ Blue 

 

 

 

 

M4 

M5 

M6 

~ Brown 
~ Blue 

~ Brown 
~ Blue 

~ Brown 
~ Blue 

 

After making all the connections of the individual fans, connect the 230Vac 50/60Hz fan lines 
to the 

MOTORS POWER SUPPLY

 input of both control boxes 

(B1-B2)

 .  

 

M4 

M5 

M6 

1 White  
2 Brown 
3 Blue  
4 Black 

5 White 
6 Brown 
7 Blue 
8 Black 

9 White 
10 Brown 
11 Blue 
12 Black 

 

2) In the 

B2-M2

 configuration, 2 bars (B1-B2) + 4 connected fans (M1-M2-M5-M6), the positioning and connection of 

the fans must absolutely respect what is shown in the image below:   
 
 
 
 

 

BOX B1 

BOX B2 

ATTENTION:

 incorrect positioning or 

connection of the fans result in 
anomalies in operation of the TRBH 
system.  

Summary of Contents for TRBH

Page 1: ...O9001 certified quality system http www tecsystem it R 1 1 29 07 20 Translations of the original instructions INSTRUCTION MANUAL TRBH SYSTEM TECSYSTEM S r l 20094 Corsico MI Tel 39 024581861 Fax 39 02...

Page 2: ...NTROL BOX B1 CONTROL BOX B2 ELECTRICAL CONNECTIONS FANS CONTROL BOX ELECTRICAL CONNECTIONS 15 CONNECTION NOTES 20 11 FANS TEST 12 FAN DIAGNOSTICS 21 13 TG180BH TG360BH TG500BH FANS DIMENSIONS 14 1200B...

Page 3: ...or smoke contact the assistance LIQUIDS Do not expose the equipment to splashes or drops do not position it in places with humidity exceeding 90 and never touch with wet hands If any liquid penetrates...

Page 4: ...vice if there is a smell of burning or smoke Contact the Tecsystem technical assistance LIQUIDS Do not expose the product to dripping or splashing liquids Do not place in places with humidity over 90...

Page 5: ...outputs for motors B1 M1 M2 M3 and B2 M4 M5 M6 230Vac 50 60Hz Range 187 265Vac 50 60Hz 1 digital output for control box B1 B2 BLDC OUT 12VDC DIMENSIONS 106x108 depth 53 50mm Din rail TESTS AND PERFOR...

Page 6: ...att INPUTS Digital input for the control box connection TESTS AND PERFORMANCE Ambient operating temperature from as indicated in the standard IEC 60076 11 IP40 degree of protection Min and max speed r...

Page 7: ...on the individual channel see table example speed CH1 table example speed CH1 Temperature CH1 Motor S and Rpm Speed Fan flow rate m h TG180BH TG360BH TG500BH 60 C S0 OFF OFF OFF OFF 61 C S1 1500 220...

Page 8: ...8 TRBH SYSTEM SYSTEM COMPONENTS Temperature control unit versions NT935BH D NT935BH ETH Control box CB3 BH B1 management bar 1 M1 M2 M3 B2 management bar 2 M4 M5 M6 Fans TG180BH TG360BH TG500BH BH bar...

Page 9: ...3 poles pitch 5 supply Code 2PL0367 Screws tightening torque 0 5Nm 2 Terminals 3 poles pitch 3 81 control box IN OUT Code 2PL0366 Screws tightening torque 0 25Nm 1 Terminal 12 poles pitch 3 81 motor...

Page 10: ...olley and centre the positioning of the bar using the central column of the transformer as a reference Fix the bar on the transformer trolley using the appropriate fixing slots suggested M8 bolts plus...

Page 11: ...lock the fans in the desired position Use the fan flappers to correctly direct the air inside the transformer columns ATTENTION always maintain a safe distance from the windings indicated by the tran...

Page 12: ...movement avoid deforming the impeller fins Never change the position of the motor If the fan bar is mounted on a transformer the fan s working position must respect the safety distance indicated in t...

Page 13: ...L BOX BAR B1 and CONTROL BOX BAR B2 using the supplied labels The identification of the two bars will be used to define the connections of the two boxes and of the fans M1 M2 M3 M4 M5 M6 associated wi...

Page 14: ...ow Power supply for 230Vac 50 60Hz motors it is used to power the B1 M1 M2 M3 box fans or the B2 M4 M5 M6 box fans The earthing cable must always be connected to the earthing terminal ELECTRICAL CONTR...

Page 15: ...colour 1MN0181 REV 0 A B Connector A motor power supply pin 1 neutral blue pin 2 phase brown pin 3 nc Connector B digital signals for motor signals pin 1 white pin 2 brown pin 3 blue pin 4 black The c...

Page 16: ...gle fan with the relative digital cable motor signals to the MOTORS CONTROL LINE output of the control box B1 bar digital connection B2 bar digital connection M1 M2 M3 1 White 2 Brown 3 Blue 4 Black 5...

Page 17: ...0Hz fan lines to the MOTORS POWER SUPPLY input of both control boxes B1 B2 3 In the B2 M1 configuration 2 bars B1 B2 2 connected fans M1 M6 the positioning and connection of the fans must absolutely r...

Page 18: ...the fans result in anomalies in operation of the TRBH system Connect the motor connector A of the single fan with the relative motor power cable to the MOTORS POWER LINE output of the control box B1...

Page 19: ...ions of the individual fans connect the 230Vac 50 60Hz fan lines to the MOTORS POWER SUPPLY input of both control boxes B1 B2 M1 M2 Brown Blue Brown Blue Connect the B motor connector of the single fa...

Page 20: ...ton of the single control box it is possible to start the fan test During the fan test the control box will activate in sequence for approximately 10 seconds on a fan the M1 M2 M3 fans connected to th...

Page 21: ...or the single motor Fan speed M1 M6 M2 M5 M3 M4 motor over temperature motor temperature over 70 C general motor failure motor blocked or under stress impeller disconnected from the motor shaft motor...

Page 22: ...22 TRBH SYSTEM TG360BH TG500BH BH BAR DIMENSIONS 1200BH 1MN0167 REV 0 1MN0168 REV 0 1MN0171 REV 0...

Page 23: ...nly when the product is damaged by causes attributable to TECSYSTEM srl such as manufacturing or components defects The warranty is invalid if the Product proves to have been tampered with modified or...

Page 24: ...the bars B1 and B2 Clean the fans using only compressed air Contact the TECSYSTEM Technical Department if the problem persists The European Directive 2012 19 EU WEEE has been approved to reduce electr...

Reviews: