The  customised  configuration  of  the  ventilation  system  provides  for  the  possibility  of  programming,  by  means  of  the 
NT935BH temperature control unit, the number of bars connected (B1 - B2) and the number of fans on the single bar. The 
following configurations BARS - FANS can be selected:   
 

1) 

B1-M1

/1 bar (B1) 1 fan (M1) connected  

HOT speed regulation reference channel (the hottest channel of CH1-CH2-CH3)                                                                                   
 

2) 

B1-M2

/1 bar (B1) 2 fans connected (M1-M2) 

Reference channel for HOT speed regulation (the hottest channel of CH1-CH2-CH3)                                                                                    
 

3) 

B1-M3

/1 bar (B1) 3 fans connected (M1-M2-M3) 

Single speed regulation reference channel CH1 (M1) CH2 (M2) CH3 (M3)                                                                              
 

4) 

B2-M1

/2 bars (B1-B2) 2 fans connected (M1-M6) 

Reference channel for HOT speed regulation (the hottest channel of CH1-CH2-CH3)                                                                                    
 

5) 

B2-M2

/2 bars (B1-B2) 4 connected fans (M1-M2-M5-M6) 

Reference channel for HOT speed regulation (the hottest channel of CH1-CH2-CH3)                                                                                    
 

6) 

B2-M3

/2 bars (B1-B2) 6 fans connected (M1-M2-M3-M4-M5-M6)  

Reference channel for single speed regulation CH1 (M1-M6) CH2 (M2-M5) CH3 (M3-M6)                                                                                                                                                                  

 
NOTE: the fan speed adjustment (rpm), with sections other than B1-M3 and B2-M3, is managed with HOT reference 
channel or the hottest channel of CH1-CH2-CH3.  

 

In order to avoid malfunction signals, it is advisable to make the TRBH system connections respecting the selected 
configuration, see control box - fans connections from page 15.  

 

E.g. 

B1-1 =

 1 bar B1 (only control box B1) and 1 fan connected M1 (only fan M1 connected).  

 

Make the connections between the control unit and box (B1) and between the box (B1) and the M1 fan. 

ASSEMBLY NOTES 
 

 

Fix the fans on the bar using the dedicated holes on the back.  Do not modify the fan fixing holes. 
During fan movement, avoid deforming the impeller fins. Never change the position of the motor. 
If the fan/bar is mounted on a transformer the fan's working position must 
respect the safety distance indicated in the manual of the transformer on which you are installing the fan. The fan must be 
positioned in a horizontal plane; always check, with the help of a spirit level, that the fan is positioned correctly. 
 
The maximum level of vibration permitted is 60Hz. 

ENVIRONMENTAL CONDITIONS OF USE 

 

Absence of fine dust. 
Absence of flammable or corrosive gases. 
Relative humidity: 90% non-condensing (for short periods). 
NB: maximum temperature as prescribed by the IEC 60076-11 standard. 
Avoid installing it in a marine environment, except after specific treatment of the metal parts. 

 

NOTE: failure to comply with the assembly notes and any use in critical environmental conditions 
such as: long periods of standstill, high humidity, high temperatures, excessive dust and excessive vibration, 
can hasten deterioration of the mechanical parts of the fans.

 

MAINTENANCE  
 

In order to maintain the efficiency of the fans, periodically perform (every 6 months) a cleaning intervention on them, using 
only compressed air. Do not use lubricants or greases of any kind. 

 

Prolonged  shutdown  of  the  fan  could  be  the  cause  of  faults.  The  installation  of  the  fans  combined  with  the  Tecsystem 
thermometric control units avoids any prolonged stops. Enabling the HFN function present in the Tecsystem control units 
it is possible to program activation cycles of the fans from 1 to 200 hours, recommended setting every 24 hours (for further 
information on the HFN function, check the manual of the control unit purchased). 

 
NOTE:  Periodic
  maintenance  and  activation  of  the  HFN  will  contribute  to  extending  the  efficiency  of  the  fans. 
Maintenance  work  on  the  fans  must  be  programmed  according  to  the  environmental  conditions  in  which  they 
operate. 

Summary of Contents for TRBH

Page 1: ...O9001 certified quality system http www tecsystem it R 1 1 29 07 20 Translations of the original instructions INSTRUCTION MANUAL TRBH SYSTEM TECSYSTEM S r l 20094 Corsico MI Tel 39 024581861 Fax 39 02...

Page 2: ...NTROL BOX B1 CONTROL BOX B2 ELECTRICAL CONNECTIONS FANS CONTROL BOX ELECTRICAL CONNECTIONS 15 CONNECTION NOTES 20 11 FANS TEST 12 FAN DIAGNOSTICS 21 13 TG180BH TG360BH TG500BH FANS DIMENSIONS 14 1200B...

Page 3: ...or smoke contact the assistance LIQUIDS Do not expose the equipment to splashes or drops do not position it in places with humidity exceeding 90 and never touch with wet hands If any liquid penetrates...

Page 4: ...vice if there is a smell of burning or smoke Contact the Tecsystem technical assistance LIQUIDS Do not expose the product to dripping or splashing liquids Do not place in places with humidity over 90...

Page 5: ...outputs for motors B1 M1 M2 M3 and B2 M4 M5 M6 230Vac 50 60Hz Range 187 265Vac 50 60Hz 1 digital output for control box B1 B2 BLDC OUT 12VDC DIMENSIONS 106x108 depth 53 50mm Din rail TESTS AND PERFOR...

Page 6: ...att INPUTS Digital input for the control box connection TESTS AND PERFORMANCE Ambient operating temperature from as indicated in the standard IEC 60076 11 IP40 degree of protection Min and max speed r...

Page 7: ...on the individual channel see table example speed CH1 table example speed CH1 Temperature CH1 Motor S and Rpm Speed Fan flow rate m h TG180BH TG360BH TG500BH 60 C S0 OFF OFF OFF OFF 61 C S1 1500 220...

Page 8: ...8 TRBH SYSTEM SYSTEM COMPONENTS Temperature control unit versions NT935BH D NT935BH ETH Control box CB3 BH B1 management bar 1 M1 M2 M3 B2 management bar 2 M4 M5 M6 Fans TG180BH TG360BH TG500BH BH bar...

Page 9: ...3 poles pitch 5 supply Code 2PL0367 Screws tightening torque 0 5Nm 2 Terminals 3 poles pitch 3 81 control box IN OUT Code 2PL0366 Screws tightening torque 0 25Nm 1 Terminal 12 poles pitch 3 81 motor...

Page 10: ...olley and centre the positioning of the bar using the central column of the transformer as a reference Fix the bar on the transformer trolley using the appropriate fixing slots suggested M8 bolts plus...

Page 11: ...lock the fans in the desired position Use the fan flappers to correctly direct the air inside the transformer columns ATTENTION always maintain a safe distance from the windings indicated by the tran...

Page 12: ...movement avoid deforming the impeller fins Never change the position of the motor If the fan bar is mounted on a transformer the fan s working position must respect the safety distance indicated in t...

Page 13: ...L BOX BAR B1 and CONTROL BOX BAR B2 using the supplied labels The identification of the two bars will be used to define the connections of the two boxes and of the fans M1 M2 M3 M4 M5 M6 associated wi...

Page 14: ...ow Power supply for 230Vac 50 60Hz motors it is used to power the B1 M1 M2 M3 box fans or the B2 M4 M5 M6 box fans The earthing cable must always be connected to the earthing terminal ELECTRICAL CONTR...

Page 15: ...colour 1MN0181 REV 0 A B Connector A motor power supply pin 1 neutral blue pin 2 phase brown pin 3 nc Connector B digital signals for motor signals pin 1 white pin 2 brown pin 3 blue pin 4 black The c...

Page 16: ...gle fan with the relative digital cable motor signals to the MOTORS CONTROL LINE output of the control box B1 bar digital connection B2 bar digital connection M1 M2 M3 1 White 2 Brown 3 Blue 4 Black 5...

Page 17: ...0Hz fan lines to the MOTORS POWER SUPPLY input of both control boxes B1 B2 3 In the B2 M1 configuration 2 bars B1 B2 2 connected fans M1 M6 the positioning and connection of the fans must absolutely r...

Page 18: ...the fans result in anomalies in operation of the TRBH system Connect the motor connector A of the single fan with the relative motor power cable to the MOTORS POWER LINE output of the control box B1...

Page 19: ...ions of the individual fans connect the 230Vac 50 60Hz fan lines to the MOTORS POWER SUPPLY input of both control boxes B1 B2 M1 M2 Brown Blue Brown Blue Connect the B motor connector of the single fa...

Page 20: ...ton of the single control box it is possible to start the fan test During the fan test the control box will activate in sequence for approximately 10 seconds on a fan the M1 M2 M3 fans connected to th...

Page 21: ...or the single motor Fan speed M1 M6 M2 M5 M3 M4 motor over temperature motor temperature over 70 C general motor failure motor blocked or under stress impeller disconnected from the motor shaft motor...

Page 22: ...22 TRBH SYSTEM TG360BH TG500BH BH BAR DIMENSIONS 1200BH 1MN0167 REV 0 1MN0168 REV 0 1MN0171 REV 0...

Page 23: ...nly when the product is damaged by causes attributable to TECSYSTEM srl such as manufacturing or components defects The warranty is invalid if the Product proves to have been tampered with modified or...

Page 24: ...the bars B1 and B2 Clean the fans using only compressed air Contact the TECSYSTEM Technical Department if the problem persists The European Directive 2012 19 EU WEEE has been approved to reduce electr...

Reviews: