background image

 

DE 

9

65_402 

 

p. 

3

 / 4

 

 

 
 
 

2. Installing the meter

 

 

Installation 

The meter meets NEMA 4X/IP65 requirements when properly 
installed. The unit is intended to be mounted into an enclosed panel. 
Prepare the panel cutout to the dimensions shown. Remove the 
panel latch from the unit. Slide the panel gasket over the rear of the 
unit to the back of the bezel. The unit should be installed fully 
assembled. Insert the unit into the panel cutout. While holding the 
unit in place, push the panel latch over the rear of the unit so that the 
tabs of the panel latch engage in the slots on the case. The panel 
latch should be engaged in the farthest forward slot possible. To 
achieve a proper seal, tighten the latch screws evenly until the unit is 
snug in the panel (Torque to approximately 7 in-lbs [79N-cm]). Do 
not over-tighten the screws.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

3. Reviewing the front buttons and display

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

Installation Environment 

The unit should be installed in a location that does not exceed the 
maximum operating temperature and provides good air 
circulation. Placing the unit near devices that generate excessive 
heat should be avoided. The bezel should be cleaned only with a 
soft cloth and neutral soap product. 
Do NOT use solvents. Continuous exposure to direct sunlight may 
accelerate the aging process of the bezel. Do not use tools of any 
kind (screwdrivers, pens, pencils, etc.) to operate the keypad of 
the unit.

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Reviews: