DE
9
65_402
p.
3
/ 4
2. Installing the meter
Installation
The meter meets NEMA 4X/IP65 requirements when properly
installed. The unit is intended to be mounted into an enclosed panel.
Prepare the panel cutout to the dimensions shown. Remove the
panel latch from the unit. Slide the panel gasket over the rear of the
unit to the back of the bezel. The unit should be installed fully
assembled. Insert the unit into the panel cutout. While holding the
unit in place, push the panel latch over the rear of the unit so that the
tabs of the panel latch engage in the slots on the case. The panel
latch should be engaged in the farthest forward slot possible. To
achieve a proper seal, tighten the latch screws evenly until the unit is
snug in the panel (Torque to approximately 7 in-lbs [79N-cm]). Do
not over-tighten the screws.
3. Reviewing the front buttons and display
Installation Environment
The unit should be installed in a location that does not exceed the
maximum operating temperature and provides good air
circulation. Placing the unit near devices that generate excessive
heat should be avoided. The bezel should be cleaned only with a
soft cloth and neutral soap product.
Do NOT use solvents. Continuous exposure to direct sunlight may
accelerate the aging process of the bezel. Do not use tools of any
kind (screwdrivers, pens, pencils, etc.) to operate the keypad of
the unit.