background image

TSR2900-10 Hardware Installation Manual 

 

 

- 6 

 

4) Do not work alone if potential dangers exist. 

5) Cut off the power before checkout. 

6) If trouble happens, take the following measures: A. Cut off the system's power. 

B. 

Alarm. 

C. 

Take  proper  measures  to  help  persons  who  are  hit  by  the  disaster.  Artificial 

respiration is needed if necessary. 

D. 

Seek for medical help, or judge the loss and seek for available help. 



Electrostatic Discharge Damage Prevention

 

Electrostatic discharge may damage devices and circuits. Improper treatment may cause 

the router to malfunction completely or discontinuously. 

Move or locate the devices according to the measures of electrostatic discharge prevention, 

ensuring the machine box connects the ground. Another measure is to wear the static-proof 
hand  ring.  If  there  is  no  hand  ring,  use  the  metal  clip  with  the  metal  cable  to  clip  the 
unpainted metal part of the machine box. In this case, the static is discharged to the ground 
through the metal cable of the clip. You can also discharge the static to the ground through 
your body. 

2.3 Requirements for Common Locations 

This part describes the requirements for the installation locations. 

2.3.1  Environment 

The router can be installed on the desk or the cabinet. The location of the machine box, 

cabinet planning and indoor cabling are very important for normal system’s function. Short 
distance  between  devices,  bad  ventilation  and  untouchable  control  plate  will  cause 
maintenance problems, systematic faulty and breakdown. 

For  location  planning  and  device  locating,  refer  to  section  2.3.2  “Location  Configuration 

Prevention”. 

2.3.2  Location Configuration Prevention 

The following preventive measures assist you to design the proper environment for 

the router. 

 

Make sure that the workshop is well-ventilated, the heat of electrical devices is 
well-discharged and sufficient air circulation is provided for device cooling. 

 

Avoid  to  damage  devices  by  following  the  electrostatic  discharge  prevention 
procedure. 

 

Put the machine box at the place where cool air can blow off the heat inside the 
machine  box.  Make  sure  the  machine  box  is  sealed  because  the  opened 
machine box will reverse the cool air flow. 

2.3.3  Cabinet Configuration 

The following content assists you to make a proper cabinet configuration: 

Summary of Contents for TSR 2900-10

Page 1: ...TSR 2900 10 Hardware Installation Manual...

Page 2: ...ing TSR2900 10 7 3 1 Installation Flow of TSR2900 10 8 3 2 Installing the Machine Box of the Router 8 3 2 1 Installing the Machine Box on the Desk 8 3 2 2 Installing the Machine Box on the Cabinet 8 3...

Page 3: ...LAN port 10 100 1000M self adaptive UTP RJ45 port Link ACT indicators 10 100 1000M Ethernet RJ45 WAN port 10 100 1000M self adaptive UTP RJ45 port Link ACT indicators 2 Combo ports WAN Multiplexing B...

Page 4: ...G0 G3 Indicators of G0 G3 ports If the indicator is on LINK works If the indicator flickers data is transmitted 6 USB USB2 0 port 7 RST Reset Reset 8 CLI Console port Cisco line sequence 9 SYS System...

Page 5: ...2 1000M Ethernet optical and Base T comb ports WAN 2 1000M Ethernet Base T ports WAN 8 1000M Ethernet LAN 1 Console port 1 USB interface 1 RESET button Packet forwarding rate 1 4Mpps Dimensions mm W D...

Page 6: ...easily gets damaged if you power on or off abruptly and frequently To restart up the router of TSR2900 10 you have to open the power on off after the power is cut down for three to five seconds Avoid...

Page 7: ...e direct current power before operating on the machine box or working beside the power source The final configuration of products must comply with relative national laws and regulations Safety Princip...

Page 8: ...hrough your body 2 3 Requirements for Common Locations This part describes the requirements for the installation locations 2 3 1 Environment The router can be installed on the desk or the cabinet The...

Page 9: ...h different location tests 2 3 4 Power Requirements Make sure that the power supply has nice grounding and the power at the input side of the router is reliable The voltage control can be installed if...

Page 10: ...Desk The TSR2900 10 router can be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the router 3 2 2 Installing the Machine Box on the Cabin...

Page 11: ...you can configure and monitor the router of TSR2900 10 by running the terminal emulation software such as super Windows terminal The cable is provided according to the host The communication parameter...

Page 12: ...ition of the pins of the Console port No Name Abbrev Remark 1 None 2 None 3 Send data TXD Output 4 None 5 Signal ground GND GND 6 Receive data RXD Input 7 None 8 None The cable is used to connect TSR2...

Page 13: ...ACT Link indicators In use the ports can connect other Ethernet terminal devices through the UTP port The numbering order of the pins in the UTP port is the same as the console port See the following...

Page 14: ...and sending the normal phase of the data 2 TP2 5 Receiving and sending the paraphrase of the data 2 TP2 7 Receiving and sending the normal phase of the data 3 TP3 8 Receiving and sending the paraphra...

Page 15: ...the power on off of the router Before operating any step in Appendix B read the section Safety Advice Before performing operations beside the power source or on the machine box turn off the power on...

Page 16: ...figure Attention After taking off the cover put it horizontally and avoid it to be crushed or collided Otherwise the machine box is hard to install 4 2 Closing the Machine Box The section mainly descr...

Page 17: ...r the air outlet and air inlet are clean and then do relative operations in section 2 3 Requirements for Common Locations If the router cannot be started and the PWR indicator is off check the power 5...

Page 18: ...this manual and must not broadcast it in any manner Trademark claims Trademarks product names service names and company names which are written in this manual but do not belong to the company belong...

Reviews: