TSR2900-10 Hardware Installation Manual 

 

 

- 5 

 

1) When the lifetime of our products ends, handle them according to national laws and 
regulations, or send these products to our company for collective processing.

 

2.2 Safety Advice 

 

Safety Principles

 

 

Keep dustless and clean during or after the installation.

 

 

Put the cover at the safe place.

 

 

Put tools at the right place where they are not easily falling down.

 

 

Put on relatively tight clothes fasten the tie or scarf well and roll up the sleeve, v avoiding 
stumbling the machine box.

 

 

Put on the protective glasses if the environment may cause damage to your eyes.

 

 

Avoid incorrect operations that may cause damage to human or devices.

 

 

Safety Notices

 

 

The safety notices mentioned here means that improper operation may lead to 
body damage.

 

 

Read the installation guide carefully before you operate the system 



Only 

professionals are allowed to install or replace the router.

 

 

Pull out the AC power socket and close the direct-current power before operating 
on the machine box or working beside the power source.

 

 

The final configuration of products must comply with relative national laws and 
regulations.

 

 

Safety Principles for Live Working

 

 

Put off ornaments, such as ring, necklace, watch and bracelet, before you 
operate under live working. When metal articles connect the power to the 
ground, short circuit happens and components may be damaged. 

 

Pull out the AC power socket and close the direct-current power before 
operating on the machine box or working beside the power source. 

 

When the power is on, do not touch the power. 

 

Correctly connect the device and the power socket. 

 

Only professionals are allowed to operate and maintain the device. 

 

Read the installation guide carefully before the system is powered on. 

Note

 

1) Check potential dangers, such as the humid floor, ungrounded extensible power line and 

tatty power line. 

2) Install the emergent on-off at the working room for turning off the power when trouble 

happens. 

3) Turn  off  the power  on-off  of  the  router  and  plug  off  the  power  line  before  installing  or 

uninstalling the machine box or working beside the power. 

Summary of Contents for TSR 2900-10

Page 1: ...TSR 2900 10 Hardware Installation Manual...

Page 2: ...ing TSR2900 10 7 3 1 Installation Flow of TSR2900 10 8 3 2 Installing the Machine Box of the Router 8 3 2 1 Installing the Machine Box on the Desk 8 3 2 2 Installing the Machine Box on the Cabinet 8 3...

Page 3: ...LAN port 10 100 1000M self adaptive UTP RJ45 port Link ACT indicators 10 100 1000M Ethernet RJ45 WAN port 10 100 1000M self adaptive UTP RJ45 port Link ACT indicators 2 Combo ports WAN Multiplexing B...

Page 4: ...G0 G3 Indicators of G0 G3 ports If the indicator is on LINK works If the indicator flickers data is transmitted 6 USB USB2 0 port 7 RST Reset Reset 8 CLI Console port Cisco line sequence 9 SYS System...

Page 5: ...2 1000M Ethernet optical and Base T comb ports WAN 2 1000M Ethernet Base T ports WAN 8 1000M Ethernet LAN 1 Console port 1 USB interface 1 RESET button Packet forwarding rate 1 4Mpps Dimensions mm W D...

Page 6: ...easily gets damaged if you power on or off abruptly and frequently To restart up the router of TSR2900 10 you have to open the power on off after the power is cut down for three to five seconds Avoid...

Page 7: ...e direct current power before operating on the machine box or working beside the power source The final configuration of products must comply with relative national laws and regulations Safety Princip...

Page 8: ...hrough your body 2 3 Requirements for Common Locations This part describes the requirements for the installation locations 2 3 1 Environment The router can be installed on the desk or the cabinet The...

Page 9: ...h different location tests 2 3 4 Power Requirements Make sure that the power supply has nice grounding and the power at the input side of the router is reliable The voltage control can be installed if...

Page 10: ...Desk The TSR2900 10 router can be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the router 3 2 2 Installing the Machine Box on the Cabin...

Page 11: ...you can configure and monitor the router of TSR2900 10 by running the terminal emulation software such as super Windows terminal The cable is provided according to the host The communication parameter...

Page 12: ...ition of the pins of the Console port No Name Abbrev Remark 1 None 2 None 3 Send data TXD Output 4 None 5 Signal ground GND GND 6 Receive data RXD Input 7 None 8 None The cable is used to connect TSR2...

Page 13: ...ACT Link indicators In use the ports can connect other Ethernet terminal devices through the UTP port The numbering order of the pins in the UTP port is the same as the console port See the following...

Page 14: ...and sending the normal phase of the data 2 TP2 5 Receiving and sending the paraphrase of the data 2 TP2 7 Receiving and sending the normal phase of the data 3 TP3 8 Receiving and sending the paraphra...

Page 15: ...the power on off of the router Before operating any step in Appendix B read the section Safety Advice Before performing operations beside the power source or on the machine box turn off the power on...

Page 16: ...figure Attention After taking off the cover put it horizontally and avoid it to be crushed or collided Otherwise the machine box is hard to install 4 2 Closing the Machine Box The section mainly descr...

Page 17: ...r the air outlet and air inlet are clean and then do relative operations in section 2 3 Requirements for Common Locations If the router cannot be started and the PWR indicator is off check the power 5...

Page 18: ...this manual and must not broadcast it in any manner Trademark claims Trademarks product names service names and company names which are written in this manual but do not belong to the company belong...

Reviews: