background image

8.1

Place the Lokring tool over the Lokring 
fitting

8. install the Lokring fitting

8.2

 

    

Note: keep out of the line of fire!

Pump until the driver of the Lokring fitting 
touches the body

 

 

   

8.3

Open the release valve on the pump and 
remove the Lokring tool 

9.1

Check that the assembly has met the 
following criteria:
• the driver is completely up against the 
body of the fitting;
• the Lokring fitting is at the "inspect" 
mark;
 • the end of the Lokring fitting's body
protrudes from underneath the driver
 

9. check the assembly

05

questions? +31 343 492 090  •  technom.com

stainless steel

installation

Summary of Contents for Lokring MTK45

Page 1: ...e for carbon steel fitting 1x GO NOGO gage for carbon steel fitting 1x 1 GO NOGO gage for carbon steel fitting 1x GO NOGO gage for Stainless Steel fitting 1x GO NOGO gage for Stainless Steel fitting 1x 1 GO NOGO gage for Stainless Steel fitting gages for other materials available on request 1 2 1x insert set for fitting 1x insert set for fitting 1x insert set for 1 fitting 2x insert retainer screws inserts...

Page 2: ...nely grade 180 400 3 access the pipe Make sure that the pipe meets the following criteria no corrosion or pitting no lettering or engraving no lenghtwise scratches or grooves 3 3 Check the external diameter of the pipe the GO NOGO gauge must not fall over the pipe 4 1 Cut the pipe as squarely as possible 5 degrees 4 prepare the pipe 02 1 3 1 3 2 questions 31 343 492 090 technom com keep out of the...

Page 3: ...rk the inspect and install areas on both sides of the pipe 5 mark the pipe 5 1 Mark the inspect and install areas on both sides of the pipe 5 mark the pipe 6 1 place the inserts in the Lokring toolhead 6 prepare the Lokring tool 6 2 Tighten the retainer screws manually 03 questions 31 343 492 090 technom com 4 2 5 1 steel stainless steel installation ...

Page 4: ... Slide the Lokring fitting over the pipe Check the install mark 7 put the Lokring fitting in place 7 1 Slide the Lokring fitting over the pipe using the gage Check the install mark 7 put the Lokring fitting in place 8 1 Place the Lokring tool over the Lokring fitting 8 install the Lokring fitting 04 questions 31 343 492 090 technom com steel stainless steel steel installation ...

Page 5: ...pen the release valve on the pump and remove the Lokring tool 9 1 Check that the assembly has met the following criteria the driver is completely up against the body of the fitting the Lokring fitting is at the inspect mark the end of the Lokring fitting s body protrudes from underneath the driver 9 check the assembly 05 questions 31 343 492 090 technom com stainless steel installation ...

Page 6: ...ump 10 3 Press the protective caps firmly in place Remove the retaining screws from the Lokring tool 11 dismantle the Lokring tool 11 2 Remove the insert from the Lokring tool 12 1 Clean the Lokring tool and put all the accessories back in the case 12 stow the Lokring tool back in the case 06 questions 31 343 492 090 technom com TIK00101 2B 11 1 ...

Reviews: