carried out by Fabrizio Frattini
Approved by Andrea Borghesi
revision 1/1
8
10/11/2011
Phase 2
Operator A
Operator B
Insert rear foot to frame unit, tightening the 2 screws
K + 1 screw J + 2+2 w nut
tighten all the arms (the screws have already been
preset by Operator B)
unhook 3 arms D, remove plate F, install the arms in the
special housings inserting 2 screws G + 2 washers for
each arm