![TechnipFMC Smith Meter AccuLoad IV Installation & Maintenance Manual Download Page 50](http://html1.mh-extra.com/html/technipfmc/smith-meter-accuload-iv/smith-meter-accuload-iv_installation-and-maintenance-manual_1069431050.webp)
AccuLoad IV Installation & Maintenance Manual
Installation
45
For new equipment, these DIP switches are set at the factory and should not need adjustment during
installation. However, any time a module is moved or replaced, the IP address must be reset according to
the table below.
3.8 Serial Communications
The AccuLoad provides four serial ports, as described in the following table and diagrams:
Table 20: MMI IP Address DIP Switch Settings
Board Set
SW-1 on A4M, A4B, and
A4I Boards
SW-2 on A4M Board
A
Switch 7: OFF
Switch 8: OFF
Switch 3: OFF
Switch 4: OFF
B (optional)
Switch 7: OFF
Switch 8: ON
Switch 3: OFF
Switch 4: ON
C (optional)
Switch 7: ON
Switch 8: OFF
Switch 3: ON
Switch 4: OFF
D (optional)
Switch 7: ON
Switch 8: ON
Switch 3: ON
Switch 4: ON
Table 21: Serial Communication Ports
Communication Port Name
Terminal Locations
Description
Comm 1
A4M-TBK1
RS-232 or RS-485 with flow control
Comm 2
A4M-TBK2
RS-232 or RS-485
Comm 3
A4M-TBK3
RS-485
Comm 4
A4M-TBE4
RS-232
Figure 42: Four-Wire RS-485 Serial Wiring
External Device
AccuLoad
AccuLoad
TX+
RX+
TX-
RX-
TX+
RX+
TX-
RX-
TX+
RX+
TX-
RX-
Figure 43: Two-Wire RS-485 Serial Wiring
AccuLoad A4I or External
Device
AccuLoad Com 1, 2, or 3
TX+
RX+
TX-
RX-
TX+
RX+
TX-
RX-
Summary of Contents for Smith Meter AccuLoad IV
Page 7: ...AccuLoad IV Installation Maintenance Manual Introduction 2 Figure 1 AccuLoad IV ST ...
Page 9: ...AccuLoad IV Installation Maintenance Manual Introduction 4 Figure 3 AccuLoad IV QT ...
Page 11: ...AccuLoad IV Installation Maintenance Manual Introduction 6 Figure 5 AccuLoad IV N4 ...
Page 14: ...AccuLoad IV Installation Maintenance Manual Introduction 9 Figure 8 AccuLoad IV SA FCM ...