6
Phone: (800) 597-3921 or (317) 803-8000 • Fax: (317) 803-8001
coolant
nozzles
MACHINE SETUP & INSTALLATION
• Turn the power switch clockwise to turn on the machine. Wait as your
machine powers up and displays the input screen.
• Touch “Head Air On” to test the Air connection. “Head Air Off” to cancel.
• Touch the “Quench Start” button on the touch screen. The pedestal
should lower into the coolant well and return automatically.
• Verify coolant is flowing from the internal coolant nozzles, filling the
pedestal well.
• Your Quencher is now ready for use.
VERIFYING PROPER INSTALLATION (QUENCHER)
• Connect the machine to your power supply.
• Connect the source air line to the machine’s air inlet.
• Verify the gauge on the Air Pressure Regulator reads 90 psi.
• Carefully pour approximately 20 gallons of clean water into the Quench
tank through the pedestal hole.
• Fill tank up to Fluid Level line. Do not spill any water on the machine.
QUENCHER SETUP
VERIFYING PROPER INSTALLATION (SHRINKPRO)
• Turn the power switch clockwise to turn on the machine.
• Wait as your machine powers up and displays the input screen.
• Touch “Head Air On” to test the Air connection. “Head Air Off” to cancel.
• Your ShrinkPRO is now ready for use.
• The 00600 ShrinkPRO requires a level, stable surface and good ventilation
for proper operation. Keep the machine clean and dry at all times.
• Connect the machine to your power supply. The machine operates on
380V-480V on a 3-phase 20 amp circuit.
• Connect the source air line to the machine’s air inlet (90 psi required).
SHRINKPRO SETUP
Summary of Contents for 00500 ShrinkPRO Quencher
Page 28: ...28 Phone 800 597 3921 or 317 803 8000 Fax 317 803 8001 MSDS Sheets for CIMTEC Coolant ...
Page 30: ...30 Phone 800 597 3921 or 317 803 8000 Fax 317 803 8001 MSDS Sheets for CIMTEC Coolant ...
Page 32: ...32 Phone 800 597 3921 or 317 803 8000 Fax 317 803 8001 MSDS Sheets for CIMTEC Coolant ...