Technibel M2Z P Installation Instruction Download Page 7

GB

7

5.3 - OPERATION

• Check circulator operation in the generator and the operation of the 2 circulators of the module. Adapt the speed of the

circulators in order to respect the flow rates. For the generator, refer to the corresponding installation manual.

Note:
When the system is off, operation can be forced by changing the parameterization:

- of 

zone 1

(accelerator on and control valve open) with 

parameter 65

,

- of 

zone 2

(accelerator on and control valve open) with 

parameter 66

,

- of the 

generator

with 

parameter 67

.

• Check that water is properly circulating in the installation (valve position).

Note: 
The mixing valves of each of the module's floor zone outgoing lines are delivered in full open position 
(position “1”).

They are equipped with a “3-point” motor for 230 VAC controlled by the zone board:

Y1

= open control signal,

N

= neutral (common),

Y2

= close control signal.

When off, it is possible to open the valves by actuating the motor using a 3 mm Allen wrench.

• Purge the installation. Check the bleeders located in the 2-zone module and heating module.

CAUTION: 
An incorrect purge could result in malfunctions and damage to the heater of the heating module.

0

10

20

30

40

50

60

70

80

90

0

0.5

1

1.5

2

2.5

3

Water flowrate (m

3

/h)

Manometric delivery head (kPa) of the circulator

Speed 1

Speed 2

CIRCULATOR SXM 32 - 55

Speed 3

6 - MAINTENANCE INSTRUCTIONS

• Before doing any work on the installation, make sure it is switched off and all power supplies locked out.
• Any work must be carried out by personnel qualified and authorised to work on this type of machine.

IMPORTANT NOTE

• Water flowrate: The module's outgoing water lines

are equipped with 1/4 SAE pressure taps at the inlet
and outlet of each circulator, to enable the pressure
loss to be measured using a hydraulic pressure
gauge. Use the following circulator curves below
(circulator SXM 32 - 55) to find the water flowrate.

• Start the system in the desired operating mode using the control box button (consult the control’s technical manual and the

control box user's guide).

Caution: 
At the end of testing and before starting the installation, the forced configuration must be deactivated
and parameters 65, 66 and 67 returned to zero.

Summary of Contents for M2Z P

Page 1: ...ONAS SUELO HYDRAULIK MODUL F R 2 ZONEN FUSSBODEN HEIZUNG ODER K HLUNG M DULO 2 ZONAS SOALHO Mars 2009 10 11 465 F GB I E D P 02 Etiquette signal tique F GB I E D P NOTICE D INSTALLATION INSTALLATION I...

Page 2: ...s of all current directives laws and regulations and according to recognized trade practices 1 3 VOLTAGE Before all operation check that the voltage indicated on the appliance rating plate corresponds...

Page 3: ...ter sensor zone 2 16 Pressure taps for water output measurement zone 1 17 Pressure taps for water output measurement zone 2 2 PRESENTATION 2 1 DESCRIPTION 74 5 43 107 600 750 260 665 251 5 170 130 120...

Page 4: ...Use the cable glands mounted on the unit see 4 2 4 Ensure that all installation grounds are interconnected Cables are not supplied Consult the module electrical diagram Also consult the installation...

Page 5: ...ocation that is representative of the temperature in zone 1 Caution In this case the remote zone 1 sensor must be activated through parameterisation on the control unit refer to control s technical ma...

Page 6: ...GURATION SETTING Set the button on the installation s control box to OFF Turn installation and module power on On the control unit configure the system for the 2 Floor Zones application parameter 70 2...

Page 7: ...leeders located in the 2 zone module and heating module CAUTION An incorrect purge could result in malfunctions and damage to the heater of the heating module 0 10 20 30 40 50 60 70 80 90 0 0 5 1 1 5...

Page 8: ...RAL MAINTENANCE All equipment must be properly maintained in order to provide optimum performance over time Faulty maintenance can result in the cancellation of the product guaranty Depending on the p...

Page 9: ...GB 9...

Page 10: ...F GB D P I E...

Page 11: ...F GB D P I E...

Page 12: ...dificarli senza preaviso En el inter s de mejoras constantes nuestros productos pueden modificarse sin aviso pr vio Unsere Produkte werden laufend verbessert und k nnen ohne Vorank ndigung abge ndert...

Reviews: