background image

 

12 

 

8. GENERAL WARRANTY AND POLICIES 

 

ARAL  MAKİNA  MADENİ  EŞYA  SAN.  VE  TİC.LTD.  ŞTİ 

provides  warranty  to  the 

buyer  within  the  framework  of  legal  provisions.  2  (two)  year  warranty  period 
against production defects starts from the actual delivery date. An invoice must 
be presented for inclusion in the warranty. 
 

Pump  +  glass  +  electric  current  high/low  voltage  resulted  to  a  digital  card 
f user errors are not covered by the warranty. 

 
In case of any damage related to production in our product, our company will 
try to repair this damage as soon as possible within the warranty period or it 
will replace the problematic part. Only spare parts approved or supplied by the 
manufacturer must be used. 
 
After  the  warranty  period,  our  company  will  continue  to  serve  you  in  the 
necessary conditions. 
 
You  are  kindly  requested  to  inform  the  relevant  dealer  where  you  have 
purchased  the  product  from  with  the  model  number  printed  on  the  label  on 
the back of the product. 
 
The  company  reserves  the  right  to  make  changes  to  the  product  after 
publication of this manual. 

 

 

DATE: 

MANUFACTURER 

ARAL MAKİNA MADENİ 

EŞYA SAN. VE TİC.LTD. ŞTİ

 

Org. San. 

Böl. 8.cad. no: 16 

KAYSERİ

 

 

 

AUTHORIZED DEALER                                                                CONSUMER 

 

 

 

 

Summary of Contents for T-30

Page 1: ...Installation Manual Boiler With Solid Fuel Model T 30 T 40 TR R...

Page 2: ...M 4 4 THE PROCEDURES AND SECURITY PRECAUTIONS BEFORE USING THE FLOOR HEATING 4 5 ELECTRONIC CONTROL SYSTEM INSTALLATION AND USE 7 5 1 INSTALLATION 7 5 2 USE OF ELECTRONIC CONTROL SYSTEM 7 5 3 FEATURES...

Page 3: ...on of pressure due to the water vapor in the boiler 2 BOILER SPECIFICATIONS T 30 FUEL TYPE SOLID FUEL HEAT POWER 30 KW BOILER INPUT OUTPUT INCH 1 OPERATION PRESSURE 1 2 BAR FLUE PIPE DIAMETER 150 mm F...

Page 4: ...way the hot water in the boiler is felt in the radiator in less time Note The diameters of the input and output pipes of the last 4 mtul radiators can be 3 4 metal pipe or 3 4 internal diameter plast...

Page 5: ...elbow and 2 pieces of pipe 6 Solid fuel floor heating boilers as seen in FIGURE 2 the inlet and outlet of the radiator must be connected to the main pipes in the heating system with the connection par...

Page 6: ...the vapor output water discharge on the expansion tank must not be closed 12 The expansion tank steam output shown in FIGURE 2 used to throw out the vapor from our boiler By drawing a line from the st...

Page 7: ...When the electronic control system is installed and the power cable is plugged the temperature and the circulation pump are visible on the display of the electronic control system 2 When pressing one...

Page 8: ...when the boiler temperature falls below the set value the circulation pump automatically deactivates and stop running The lowest limit must be 55 C When the temperature drops below 55 C condensation...

Page 9: ...5 C in extreme cold conditions the circulation pump activates and does not allow any freezing in the installation and boiler through circulating the heating water inside the boiler and the installatio...

Page 10: ...at the remaining air in the boiler and in the installation is pumped into the expansion tank by running the pump for 10 minutes Note The procedures listed in Articles 3 and 4 above should be made in t...

Page 11: ...n damage the installation and boiler Our companyisnotresponsibleforthesedamages 8 Solidfuelboilersshouldnotbeloadedwithmorethanthecapacityoffuel Ourboilercan bedamagedduetoexcessivefuelloading 9 Anadd...

Page 12: ...uct our company will try to repair this damage as soon as possible within the warranty period or it will replace the problematic part Only spare parts approved or supplied by the manufacturer must be...

Reviews: