background image

408-35037 

Rev 

A

 

of 5

 

6.  Slide the terminal strip into the tool until the terminal contacts the Terminal Stop. 

Adjust the Terminal Stop to position the tab in the center of the Cut-off Shear (see Figure 9) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Figure 9 

5.

 

CUTTING PROCEDURE 

1.  Insert strip terminals into the Strip Guide until the Terminal Stop is reached. 

2.  Cycle the hand tool to shear the terminal from the carrier strip. 

Measure the cut-off tab length to confirm it is within TE specification for the specific terminal being 
cut. 

Note

: If cut-off tab does not meet the TE specification, repeat set-up procedure in Section 4. 

3.  When cut-off tab length meets the TE requirement, advance terminal strip to position the next 

terminal against Terminal Stop and cycle tool.  Additional loose-piecing of terminals may commence. 

6.

 

TOOL MAINTENANCE AND INSPECTION 

6.1.

 

Maintenance 

Remove any debris with a clean, soft brush. Ensure that the tool is clean by wiping it with a clean, soft 
cloth. DO NOT clean with objects that could damage any components. 

6.2.

 

Visual Inspection 

1.  Inspect the tool on a regular basis to ensure excessive wear or any damage does not exist. 

If damage or abnormal wear is evident, the tool must be replaced (refer to Section 7). 

2.  Inspect the Cut-off Anvil and Cut-off Shear for chipped, worn, or broken areas 

 if evident, refer to 

Section 7. 

7.

 

REPLACEMENT 

If the Cut-off Anvil and/or Cut-off Shear are damaged or worn excessively, the tool must be replaced. Order a 
new tool through your TE representative; call 1-800-522-6752, send a facsimile of your purchase order to 
717-986-7605, or write to: 
 

CUSTOMER SERVICE (038-035) 
TE CONNECTIVITY CORPORATION 
PO BOX 3608 
HARRISBURG PA 17105-3608 

8.

 

REVISION SUMMARY 

Initial Release 

Cut-off 
Shear 

Terminal 
Stop 

Correct Setting 
for Terminal Stop 

Reviews: