RECEIVING INSPECTION AND INSTALLATION
3.1.
Receiving inspection
These machines are thoroughly inspected during and after assembly. A final series of inspections are made to
insure the proper machine functioning before packaging and shipping.
Despite careful packaging, damage may occur during shipping. Upon receipt, remove the machine from the
crate and carefully inspect for damage. If damage is evident, file a claim against the carrier and notify TE
immediately.
3.2.
Installation
Remove all mounting bolts securing the machine to the shipping pallet. The lifting points are located on the top
of the machine (Figure 7).
NOTE
Bow shackles are installed in the machine for use as lifting points. Reference TE PN 2337840-1 for replacement.
CAUTION
Always use lifting points when moving equipment.
CAUTION
Both
lifting points must be used when lifting the machine.
CAUTION
The machine weighs 390 Kg [860 lbm]. The lifting equipment must have a safety factor of at least 1.5 - 2 times the weight of
the machine.
Attach a suitable hoist to the lifting points, lift the machine, and place it in the selected operating location.
Figure 7: Lifting points