
- 13 -
TDK-Lambda
EZA2500 series
Quick Manual / Practical (III)
⑦
Click "
設定
" →"
アドレス
" to open the following window. “
治具
” is the address of your
computer. Set the address of EZA2500 to one of converters 1-6. The EZA2500 is set to
“0” when shipped from the factory. Once set, click OK to close the window.
Open the window shown below and operate in the following order.
①
Click “
発行
”(issue) for unlocking.
→ “Communication Status” displays an error message, but ignore it.
→ After issuing the command, the "
読み出し
"(readout) button for "HVDC 0V
起動
"
(HVDC 0V startup ) can be operated.
②
Click the "
読み出し
"(readout) button of “HVDC 0V
起動
" (HVDC 0V startup ) to
read the current setting of
“
HVDC 0V
起動
".
→ The result is displayed in the Upper radio button.
→ After executing the read operation, the "
書き込み
"(write) button of "HVDC 0V
起動
"
(HVDC 0V startup ) can be operated.
③
Click the "
有効
"(enable) radio button of "HVDC 0V
起動
" (HVDC 0V startup ) and
click the "
書き込み
"(write) button.
④
Click the "
読み出し
"(readout) button of “HVDC 0V
起動
" (HVDC 0V startup ) to
confirm that the current setting of “HVDC 0V
起動
" (HVDC 0V startup ) is enabled.
The "Grid Ramp Up" is now effective.
②
Enable "Grid Ramp Up".
①
②
③
④
⑦