Foundation Procedure
Setting Out
A ring shaped hole matching the
size shown above, will be
excavated to create the solid
concrete foundations in which the
legs are fixed to and the chain
will be dropped in. The concrete
foundations must remain level.
Once the correct position of the
ring has been marked prior to
excavation, the use of a datum
peg is highly recommended in
order to easily relocate the
exact foundation position.
Excavation & Foundation
Positioning
Procedure
In loose ground, it may be necessary to use
timber framework (or shuttering) to prevent
soil falling into the hole. It will also
prevent an unnecessary excess volume of
concrete being used. Concrete to be in 30/N
mm2 mix. Total volume required: 5.55 cubic
metre. It is important to ensure that the
concrete blocks are level. Whilst the
concrete is wet drop the chain into the four
corner positions shown on the next page.
*A sheet of A252 mesh reinforcement should be
pressed into the top of the fresh concrete,
to cover the entire surface ensuring at least
50mm cover.
A252 Steel Reinforcement Mesh
Not Supplied