C713 Operator Training
C713 Operator Training
2
C713 Operator Training
C713 Operator Training
Impact Servings:
How many servings can be drawn before the product becomes soft (unservable)?
Recovery Time: 1 - 2 minutes
Note: The soft serve draw rate is critical.
The rate must be 5 - 7.5 oz. (150 - 225 g.) per 10 seconds.
The way we measure
capacity is by how many
servings can be drawn before
the machine needs time to
recover the mix to the proper
viscosity.
The C713 can handle the
following impact servings:
35- 3.5 oz. Sundaes
Note: The machine needs 1-2
minutes of recovery time after
this level of impact servings.
35 servings
Impact Servings:
Consistency/Capacity