4.8 BEVERAGE EQUIPMENT:   

   

 

 

                            

 

 

4.8.6.3 Iced Cappuccino Machine 

14 

Issue Date: February 21, 2008 

Taylor 390 

 

Last Modified: October 31, 2008 

9.  Slide the long drip pan into the hole in the front panel.   

     

      

10. Install the front drip tray and the splash shield under the door spout. 

      

 

Sanitizing 
12. Prepare two gallons (7.6 liters) of a 200 ppm solution of sanitizer.   
13. Place the large white gong brush into the hopper and pour the sanitizing 

solution onto the brush bristles allowing it to flow into the freezing cylinder.  
Ensure that the prime plug is finger tight (closed).  While the solution is 
flowing into the freezing cylinder, brush clean the mix hopper, mix inlet hole 
and mix level sensing probes. 

     

     

 

14. Place the control switch in the “WASH” position.  

This will cause the sanitizing solution in the 
freezing cylinder to be agitated.  Allow the 
solution to agitate for five minutes.

 

 

15. Place an empty mix pail beneath the door spout 

and move the draw handle to the right.  Remove 
all of the sanitizing 
solution.  When the 
sanitizer stops flowing 
from the door spout, 
move the draw handle to 
the left and place the 
control switch in the 
“OFF” position. 

11. Ensure that the control switch is in the 

“OFF” position and then remove the 
lockout equipment from the circuit breaker.

All manuals and user guides at all-guides.com

Summary of Contents for 390

Page 1: ...er Iced Cappuccino Parts Tray C Safe Circuit Breaker Lockout Kit O Ring Remover Tool TDL Tune Up Kit 78116 Double Ended TDL Kit 71092 Use on All O Rings All Holes in Metal Parts O Ring Grooves on All...

Page 2: ...l X52595 6 Screw 011694 7 Base Pan Gasket 050947 8 Base Pan Gasket Insert 051150 9 Spinner X66023 27 10 Drip Tray 046275 11 Wire Splash Shield 046177 12 Drip Pan 035034 13 Side Panel Lower Left 050935...

Page 3: ...e Clip 046238 3 Prime Plug 050405 14 Scraper Blade 046237 4 O Ring 563 OD x 070W 043758 15 Guide Bearing 014496 5 Draw Handle X47384 16 Door Gasket 014030 6 Draw Valve 047734 17 Front Bearing 013116 7...

Page 4: ...ing light is located on the front of the machine The indicator light will flash to indicate that the mix hopper is empty and the mix supply needs to be replenished To prevent damage to the unit refrig...

Page 5: ...TRAY Place parts in the assigned area when cleaning the machine Beater Shaft Torque Assembly Beater Shaft O Ring Draw Valve Draw Valve O Rings 2 Valve Handle Pin Draw Valve Handle Freezer Door Door Ga...

Page 6: ...tized Salmon cloth and a solution of Sanitizer to clean the spinners 3 Switch the unit back to the FREEZE position when cleaning is complete to ensure that the product in the freezing cylinder does no...

Page 7: ...allow the frozen product to soften 2 Remove the hopper cover Take to the sink for cleaning 3 Place a pail under the door spout and move the draw handle to the right When all product stops flowing from...

Page 8: ...se water being drawn from the freezing cylinder is clear Disassembly NOTE BE SURE THE CONTROL SWITCH IS IN THE OFF POSITION Failure to do so may cause injury from electrocution or hazardous moving par...

Page 9: ...sing a dry Salmon cloth or paper towel apply pressure in an upward direction until the O Ring pops out of its groove With the other hand push the top of the O Ring forward and it will roll out of the...

Page 10: ...Place your hand into the back of the freezing cylinder grasp the beater shaft and pull straight out towards you to remove Remove the beater shaft seal and O Ring from the beater shaft Use a Salmon cl...

Page 11: ...1 To reassemble the beater drive shaft slide the beater shaft seal onto the beater shaft until it snaps into place and then slide the O Ring into the first groove Lubricate the groove O Ring and beate...

Page 12: ...freezing cylinder and slide into position over the drive shaft Turn the beater slightly to be certain that the beater is properly seated When in position the beater will not protrude beyond the front...

Page 13: ...the draw handle This will lock the ice buster in place With the draw valve handle in place install the draw valve pin and rotate the draw valve handle to allow the draw valve pin to fall into place In...

Page 14: ...closed While the solution is flowing into the freezing cylinder brush clean the mix hopper mix inlet hole and mix level sensing probes 14 Place the control switch in the WASH position This will cause...

Page 15: ...he draw handle to the right Dispense approximately 2 oz of the mix to force out any remaining sanitizing solution and then move the draw handle to the left Discard the dispensed waste Iced Cappuccino...

Page 16: ...ft Boot Seal 1 x Tool O Ring Removal 1 x Scraper Blade 2 x O Ring 563 OD x 070W 1 x Lubricant 1 x NOTE In order to maximize performance and efficiency of the unit all parts should be replaced three ti...

Reviews: