6. Once satisfied that there are no leaks, turn the water supply off and disconnect the valve from the
flexible hoses. Before installing plasterboard and tiles, use the zip tie provided to tie the ends of the
hoses together to make them easier to access later.
You are now ready to apply the final finished surface.
7. Reattach the tile guide using the fixing screws. Cut a hole in the plasterboard using the tile guide to
determine position and sizing.
Tip: There are pins in the corners of the tile guide to help mark its position on the plasterboard to use as
a cutting template.
Figure 8
Figure 9
HOT
OUTLET 1
COLD