RUN
X
25
5.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Display console
C
I
Plastic covers
C
I
Screws and cable connections
I
Legend: C = clean; I = inspect
6
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an recycling centre. Further information can be obtained from
your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for RUN X
Page 2: ...RUN X 2...
Page 12: ...RUN X 12 Philips Pan head full thread screw M4 16...
Page 30: ...111 110 RUN X 30 8 2 Exploded Drawing...
Page 35: ...35...
Page 36: ...Treadmill RUN X...