32
Chin & Dip
4.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Cables
C
I
Screw connections
I
Pulleys and cable routing
I
Slide rails/Guide rods
I
Cushions
C
Legend: C = clean; I = inspect
5
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an recycling centre. Further information can be obtained from
your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for Dual Pro
Page 2: ...2 Chin Dip...
Page 4: ...4 Chin Dip...
Page 13: ...Glide frame 38 1 Main frame 34 2 1 Sliding guide rod 54 2 13...
Page 15: ...15...
Page 17: ...65 65 013 012 46 A B C D 17...
Page 19: ...19...
Page 21: ...21...
Page 23: ...23...
Page 25: ...25...
Page 27: ...003 020 60 021 61 48 014 028 002 27...
Page 29: ...29...
Page 39: ...39 7 3 Exploded Drawing...
Page 40: ...17 Exploded View 2 2 2 2 2 118 118 40 Chin Dip...
Page 45: ...45 Notes...
Page 46: ...46 Chin Dip Notes...
Page 47: ...47...
Page 48: ...Dual Pro Assisted Chin Dip...