background image

6.  Pull out one front corner and stake. Repeat with other front corner. The 

goal is a regular pentagon.  Remove stake at vestibule end and reinsert 

through guyline stake loop. Make sure there is slack in the line to allow 

the vestibule fabric to rise up when the pole is inserted.

7.  Insert pole handle (or tip) through vent or underneath the vestibule and 

insert the tip (or handle) into the apex cone.  The pole should be on the left 

side of cross strut.

8.  Set the other end of the pole on the ground and bring it as close to vertical 

as you can. The goal is high tension. 

9.  Use line tighteners (pull cord end to tighten; lift lever to loosen) to adjust 

tension line at vestibule. Walk to back wall and stake center strut guyline. 

Adjust end tensions and vertical pole tension until shape is symmetrical 

and ridgelines are taut.  Be sure tension lines at strut supported ends follow 

ridgeline direction.

Tarptent Aeon Li

Setup
Basic setup is very easy.  It will take about 

2 minutes once you get the hang of it.  For 

additional photos and setup video, see 

https://www.tarptent.com/product/aeon-li/
1.  Spread canopy on ground, floor side 

down. Remove stakes from stake bag and have ready.  

2  Set trekking poles to about 115-120cm/ 45-47in or assemble substitute pole.

3.  Pull out one strut supported end of the canopy, spread strut ends apart, insert 

stake through O-ring and stake to ground.

4.  Now walk to the other end of the stucture, pull out opposite end, and stake 

through O-ring.   The long back wall should be taut. Restake as necessary.

5.  Now pull the vestibule edge out until centered. 

Stake through both loops where the vesibule closes. The goal is a regular 

triangle as shown.

Stake through

 O-ring

Pull tight

Reviews: