15
step 9:
Do not completely tighten screws until all screws are in place.
1. Hanging the curtain (N) to the beam (B) by using the connection buckle (K).
2. Insert the ground spikes (S) through the post base (I) and into ground.
2.
1.
A
A
A
A
N
N
N
N
I
I
I
I
S
E
K
(Part S)×16
ground spike