A
LPHA
PID S
IGN
I
NSTALLATION
AND
M
AINTENANCE
M
ANUAL
(1260600601 R
EV
.
B
)
6-1
Maintenance
6
Physical inspection
A physical inspection of the sign’s exterior and interior should be performed every 6 months.
Exterior inspection
•
Check for any physical damage to the exterior of the sign.
•
Check for loose nuts, bolts, hinges, doors, and so on.
•
Check the exterior electronics for foreign debris and general cleanliness.
•
Check the exterior of the sign for general cleanliness.
•
Check the LEDs of the sign for general cleanliness and visibility.
Interior inspection
•
Check for any physical damage to the interior of the sign.
•
Check for loose nuts, bolts, hinges, doors, and so on.
•
Check the interior electronics for foreign debris and general cleanliness.
•
Check the interior of the sign for general cleanliness.
•
Make sure all fans are operational.
Procedure
Page
Front lens cleaning (outside of sign)
Replace the Ethernet to fiber optic converter.
Replace the light sensor assembly.
Replace the 4.2VDC power supply.
Replace the 5VDC power supply.
Summary of Contents for Adaptive Alpha Premier
Page 42: ...THIS PAGE INTENTIONALLY BLANK...