http://www.titanjet.com.cn
Tel
:
+86-760-88667089 / 88667090
Fax
:
+86-760-88667096
Web: http://www.titanjet.com.cn
email:[email protected]
Add
:
No.6-2,Jin Hua Zhong Road,Zhongshan City,Guangdong,China
- 7 -
Move Down: Material move forward button
3.
Installation of Titan-jet 1901/1902 water base & eco-solvent piezo
printer
Installation steps after unpacking
:
3.1
:
unpacking: Remove the
Buffer foam and dustproof plastic wrap
after unpack, take out of all spare parts, check
Attention
:
Check carefully to confirm no spare parts lost!!
!
3.2
:
installing the stand
Take out 2 stander, stabilize beam
。
to fix
stander with 10pcs M6*10
inner hexagon screw
。
Fix the Square stabilize beam on the stander
with 8pcs M5*10 cross screw.(See illustration)
Installation illustration of Stander and Square stabilize beam
3.3 Installation of material holder and fans
3.3.1.
Installation of material holder
A: Fix the material holder on standers with 16 pcs M4*10 cross screw(each side 8 pcs screw)
。