Rev.2013-08-25-01
21
9. Applications
9.1 Check card
We recommend that you carefully fill it, during and after the initial star up of the unit.
1. Supply fan:
:
2. Exhaust fan:
:
3. Setting of motor protection:
4. Pressure switch “dirty filter” – fresh air:
5. Pressure switch “dirty filter” – exhaust air:
6. Pressure switch “danger of freezing of recuperative heat exchanger” :
7. Thermo switch “bypass”:
8. Actuator – bypass damper of recuperative
heat exchanger:
Model:
Phase:
I
/nominal/
[A]
(from
Manufacturer)
I
/measured/
[A]
(from Installer)
Model:
Phase:
I
/nominal/
[A]
(from
Manufacturer)
I
/measured/ [A]
(from Installer)
Supplay fan
[
А
]
From Installer
Exhaust fan
[
А
]
From Installer
Δ
P
1
[Pa]
From Manufacturer
Δ
P
2
[Pa]
From Manufacturer
Δ
P
3
[Pa]
From Manufacturer
Т
1
[°C]
From Manufacturer
М
2
Model:
From Manufacturer
Summary of Contents for EVB - HiE
Page 2: ...Rev 2013 08 25 01 1 ...
Page 19: ...Rev 2013 08 25 01 18 ...
Page 20: ...Rev 2013 08 25 01 19 ...
Page 23: ...Rev 2013 08 25 01 22 9 2 Identification plate ...
Page 26: ...Rev 2013 07 25 01 25 ...
Page 27: ...Rev 2013 07 25 01 26 ...
Page 28: ...Rev 2013 07 25 01 27 ...