
16
Particular attention should be paid to clearances between any parts of the test object at test voltage
potential and the test enclosure or barriers. Refer to local safety standards for details of the clearances
required.
2.1.3
Inspection
Ensure that the unit and all leads are inspected for integrity and for signs of damage each time before
any testing is started.
Ensure the high voltage leads are carefully stored and that the exposed ends are kept clean, and that
the protective plastic cover is fitted over the connector.
The earth cable and the earth cable on the discharge/earthing probe are both made from a very flexible
copper conductor with transparent silicon insulation to allow visual inspection.