background image

Tandberg Data 

StorageLoader 

There will be variations of this list. Please refer to your Quick Installation guide 
shipped with the StorageLoader. 

 Note: The StorageLoader contains no cartridges before shipment. 

 

Step 2. Installing the StorageLoader in a Rack 

The StorageLoader 1U is designed for use in 19” rack system using 1U of rack 
space. The length of the power cord and the SCSI cable may restrict the placement. 

Attention:

 The StorageLoader is designed to operate in a horizontal position. Do 

not attempt to operate the StorageLoader in any other position than horizontally. 
Also make sure that: 

• 

The airflow around the front and back of the StorageLoader is not 
obstructed. 

• 

There is a minimum of 60cm free space in front of the unit to allow the 
operator to safely remove the magazines. 

• 

The display and operator controls are easily accessed. 

• 

The StorageLoader is away from the floor, and in a clean environment with 
temperature within specification.  

 

The Rack Mounting Kit includes the following items: 

• 

Rail Left Assembly 

• 

Rail Right Assembly 

• 

Screw M6x12 (6 pieces) 

• 

Screw M5x8 (2 pieces) 

 

Recommended mounting tools: 

• 

Folding rule or tape measure 

• 

Screwdriver  

• 

7 mm open-end wrench 

 

Note:

 The rails are mounted to the loader during transportation. Before mounting 

the rails into the rack, dismount the rails from the loader and remove the spacers 
between the rails and the loader. 

 
 

6

 

StorageLoader Quick Installation Guide 

Summary of Contents for StorageLoader

Page 1: ...TANDBERG DATA StorageLoaderTM QUICK INSTALLATION GUIDE TANDBERG DATA ASA P O Box 134 Kjels s N 0411 OSLO NORWAY Phone 47 22 18 90 90 Telefax 47 22 18 95 50 Tandberg Data ASA Part No 433060 02 May 2005...

Page 2: ...ich patents are granted or pending By publishing this information Tandberg Data ASA conveys no license under any patent or any other rights Every effort has been made to avoid errors in text and diagr...

Page 3: ...er On Selftest 11 Step 6 Setting the SCSI Address 11 Step 7 Connecting the SCSI Bus Cable 12 Step 8 Connecting the Ethernet Connector 13 Step 9 Restarting Your System 14 Step 10 BCR Labeling of cartri...

Page 4: ...wing the instructions displayed on the front panel Select the appropriate SCSI ID s and unit options Connect the SCSI interface cable and optionally the Ethernet cable Install the backup application s...

Page 5: ...contents of the shipping container to be sure that all parts were included in the shipment A standard package for the StorageLoader consists of the following items A factory assembled StorageLoader un...

Page 6: ...low around the front and back of the StorageLoader is not obstructed There is a minimum of 60cm free space in front of the unit to allow the operator to safely remove the magazines The display and ope...

Page 7: ...aution Consider rack stability when deciding where to place the StorageLoader hazardous conditions can be the result of uneven mechanical loading of a rack StorageLoader 1U uses 1U of vertical rack sp...

Page 8: ...Assembly on the left side of the rack between the rear rack mount rail and the front rack mount rail 5 Mount the Rail Left Assembly at desired height using one M6x12 screw in front upper hole in rail...

Page 9: ...o the Rack Make sure that all the screws in the Rack Mounting Kit are tightened properly before installing the StorageLoader in the rack Slide the StorageLoader on the rails from the front of the rack...

Page 10: ...system 2 Plug the power cable into the rear of the StorageLoader see figure 9 Plug the other end of the cable into a properly grounded electrical outlet Note Reliable earthing depends on earthing in...

Page 11: ...robot if you need to return your StorageLoader to the supplier for service or repair Important The warranty does not cover damage to the loader shipped without the locking screw properly installed Ste...

Page 12: ...ation and User manual for details You may also wish to reserve a magazine slot for a cleaning cartridge and set a security password at this time Changing some of these settings causes the StorageLoade...

Page 13: ...ure the cable with the thumbscrews on the connector 3 Connect the other end of the SCSI cable to the appropriate SCSI adapter on your system and fasten it with the thumbscrews 4 If the StorageLoader i...

Page 14: ...m power on until it s active on the SCSI bus It is recommended to turn on the power at least 40 seconds before the computer system is started Step 10 BCR Labeling of cartridges If your loader is equip...

Page 15: ...Tandberg Data StorageLoader Figure 13 Positioning of bar code label for DLT cartridges StorageLoader Quick Installation Guide 15...

Reviews: